Oficentro Asebanacio
Sebastián Alfaro Fuscaldo
Product Spec Sheet

ElementBrandProduct Name
Extraclear Planibel glassAGC Glass Europe
Stainless Steel RailingCOMENZA
Sigma Operable Wall SystemAdvance Equipment
L Series Steelcraft Flush DoorAllegion
Evolve Matt tiles (30X60)Atlas Concorde
Neo-Ray Led LightingCooper Lighting

Product Spec Sheet
Extraclear Planibel glass
Stainless Steel Railing
by COMENZA
Sigma Operable Wall System
L Series Steelcraft Flush Door
Evolve Matt tiles (30X60)
Neo-Ray Led Lighting

Oficentro Asebanacio

ICESA as Architects

The fast-growing Employee Solidarity Association of the National Bank of Costa Rica was in need of a new headquarter. They envisioned not only to build their house, but to create a common roof to shelter institutions with shared values and synergies.


The building is located in Llorente de Tibás, a mixed and varied urban fabric that changes dramatically both in landscape and program on every side of the irregular plot. The east facade faces a National Highway, the northern one faces a commercial street and the south side of the plot borders a sprawled residential community. The building accordingly responds differently to every side, situation that is intensified by the bioclimatic parameters that requested the maximum light from the north and south and thermal reductions from the strong east and west lights. This is contrary to the plot geometry that has the shortest side to the northand a reason why the concrete louvers were proposed as a project feature. The access to the building occurs from a covered small plaza, after which the height is reduced to a minimum before opening again in a narrow atrium. The atrium is located in the center of mass of an irregular footprint and floods with light and air the heart of the building. All the interior facades and balustrades around the voids use cristal clear, low iron glass to improve the skylight penetration.


The plaza is the result of a subtraction on the base of the building and the cover is provided by the cantilevered fourth and fifth floors above. This cantilever required the facade to exchange louvers to a concrete wall that works as a one-and-a-half storey beam. Additional cantilevers serve as shades and maintenance platforms.


The upper level house shared programs of the different institutions keeping the area with the best views fully accesible to all the employers, promoting at the same time collaborations between institutions.

Project Credits
Products Behind Projects
Product Spotlight
News
ARW completes the renovation of a former 1950s Pirelli property in Milan
4 Dec 2023 News
ARW completes the renovation of a former 1950s Pirelli property in Milan

Italian architectural studio Botticini+ Facchinelli ARW (Architectural Research Workshop) has comple... More

MVRDV transforms office building into vibrant workspaces for social impact campus in Berlin
4 Dec 2023 News
MVRDV transforms office building into vibrant workspaces for social impact campus in Berlin

Atelier Gardens is an evolving campus in Berlin intended to serve impact organizations, film busines... More

Archello Awards 2023 Winners – Products
4 Dec 2023 Archello Awards
Archello Awards 2023 Winners – Products

Archello Awards 2023 has revealed the products selected as winners of each of this year’s awar... More

Archello Awards 2023 Winners – Projects
4 Dec 2023 Archello Awards
Archello Awards 2023 Winners – Projects

Archello Awards 2023 has revealed the projects selected as winners of each of this year’s awar... More

Berger + Parkkinen transforms three vacant Viennese post-war buildings into a glassblower’s studio
1 Dec 2023 News
Berger + Parkkinen transforms three vacant Viennese post-war buildings into a glassblower’s studio

Austrian-Finnish architecture firm Berger + Parkkinen has completed the transformation of an unused... More

Carr’s sustainable Bruce Street building is a catalyst for urban renewal
30 Nov 2023 News
Carr’s sustainable Bruce Street building is a catalyst for urban renewal

In Melbourne’s inner-city suburb of Kensington, a new red brick and concrete building pays tri... More

Pricegore revitalizes a 1960s brutalist terrace in London’s Chelsea district
29 Nov 2023 News
Pricegore revitalizes a 1960s brutalist terrace in London’s Chelsea district

London-based architectural practice Pricegore has revitalized a modernist terrace townhouse in Londo... More

Detail: Thatch enclosure of the 'Tane Garden House', Vitra Campus
29 Nov 2023 Detail
Detail: Thatch enclosure of the 'Tane Garden House', Vitra Campus

ATTA-Atelier Tsuyoshi Tane Architects has completed a thatch-covered building with a footprint of 15... More