The new center will research and develop automated solutions to build large-scale structures such as wind turbines, ships, and structures for building. With the new building for the center, the activities can unfold to it’s full potential, allowing researchers and companies to develop robots for the large-scale structures – robots which don’t exist on that scale today.
A beacon for large structure innovation
The new robotics center will serve a landmark for the transformation of the maritime sector, construction, and energy sectors and the robotics industry. The new building makes for a striking arrival at the Port and Odense with its strong references to both the existing industrial buildings at Lindø and SDU.
In the judge’s motivation it is stated that the building will heighten the overall building quality of the old shipyard area. The new building is expected to be completed by 2025 and will by then house robots and technological equipment as well as students, researchers and companies.
The architectural concept for the Large Structure Production Center
Our project comprises three buildings under one unifying membrane: the façade. We have chosen this approach to unite the diverse requirements of the building’s functions, so that the LSP center is perceived as one cohesive and distinctive building.
Compositionally, we use the distinct and contrasting heights of the three building programs; Hangar, Warehouse, and Administration, to create a varied but cohesive sculptural volume, with the potential to become a natural landmark in the landscape – and for the arrival to the harbor.
The Hangar
In the layout, it has been a guiding principle that the production path from the maneuvering area to the Platform and into the Hangar is a continuous and straight path.
The Warehouse
The Warehouse is placed as a nearby annex to Platform 1 so that new equipment can be easily placed or models and similar can be redistributed to and from the Hangar. Around Platform 1, the Hangar and Warehouse form a light and logical triangle for movement with the large doors close to each other.
By moving the Warehouse’s location slightly towards the south, space is created for the access road to the general parking to be led away from the Platform and behind the Warehouse. In this way, we avoid crossing traffic and create an easily readable logistics on site.
The Administration
The Administration is placed in one level alongside the Hangar towards the east. Here, there are good opportunities for direct contact with the Hangar, while creating a covered connection to the Warehouse. Parking is thus located towards the south, and the main entrance to the entire facility is visible from the Coastal Road upon arrival at the harbor.
The Administration building itself becomes an elastic building in expression, reaching out and holding on to the large volumes; the Hangar and the Warehouse, and thus tying the entire building complex together. While embracing the function’s enormous scale in the exterior, we break down the scale in the interior and create experiential spaces for the human scale.