The Christenson Electric Headquarters renovation transformed the company’s existing office from a disjointed workspace into one with intention and flow. The design reorganizes public, private, and collaboration areas into a hierarchy that supports operations and culture and is strategic with the in-between spaces and how they contribute to the overall office environment. The design-build delivery method enabled Scott Edwards Architecture, Bremik Construction, and the project team to effectively navigate several project challenges, including the need for a complete design reimagining when the COVID-19 pandemic informed how offices would need to evolve. The result is a bright, welcoming space that is functional, comfortable, and helps tell Christenson Electric’s story.

photo_credit Josh Partee
Josh Partee

When the project initially began in October 2019, the design entailed maximizing the site and adding 10,000 SF of new building area. Several factors inspired a redesign, one of which was the pandemic. After a pause in the process, the team restarted design in December 2020 and instead of thinking “out and up”, the concept looked inward and considered reconfiguration that would alter very little of the footprint. To achieve the desired results, a comprehensive understanding of Christenson’s operations was necessary—the interior’s reorganization carefully balances open, closed, and collaborative office spaces in response to actual, rather than assumed needs. 

photo_credit Josh Partee
Josh Partee

The entry space introduces the history of Christenson Electric through a company timeline—this storytelling piece spans an entire wall and showcases images and milestones from the company’s more than 75 years of operation.

The existing office’s circulation was fractured, and recomposing the flow and creating a voluminous feel within a single story was a primary project goal. As the building’s entry is within the addition, this presented an opportunity to apply these concepts from the ground up and in a space that would have a significant impact. The entry’s design features abundant natural light, high ceilings deliberately unobstructed by ducts and conduits, and open sight lines to the reception desk and beyond. 

photo_credit Josh Partee
Josh Partee

The breakroom’s folding glass door opens onto an outdoor courtyard space complete with festoon lights. The building’s canted addition frames in one side of the courtyard, and the landscape architect, Lango Hansen, developed a design that uses plants and pavers not only aesthetically, but as a way to shield the space from the wind.

photo_credit Josh Partee
Josh Partee

The daylighting strategy for the Christenson Electric Headquarters renovation is innovative in numerous ways, particularly when considering the project’s budgetary constraints, and found creative ways to help the space breathe. First, reorganizing the floorplan to place private offices deeper within the space, thus opening up the perimeter and letting in more natural light from windows, reduced the number of interior walls that blocked the light. The design then placed public and collaboration areas within this spine, keeping it open and bright. Similarly, skylights are installed along these main corridors, and secondary corridors have windows at their ends. The new addition’s clerestory windows, the breakroom’s folding glass door, and the increased ceiling height all contribute to this deliberate and budget-conscious strategy.

photo_credit Josh Partee
Josh Partee

The renovation’s materiality pulls from old and new. The existing building’s brick facade is applied to feature walls in the interior, and high-use hallways are lined with warm wood. The interior designer, Bainbridge Design, offers a fresh take to Christenson Electric’s existing palette and chooses key moments to apply the brand’s iconic red. The high-impact decision to remove the acoustic ceiling tiles, thus raising the ceiling height, affected the space's feel dramatically. 

photo_credit Josh Partee
Josh Partee

The choice to remove the acoustic ceiling tiles presented a challenge in that the ducting and electrical now exposed were not originally meant to be visible—SEA and the project team collaborated to clean this area up visually, painting everything from the datum line and upward dark gray and below it white, maintaining the desired visual area.

photo_credit Josh Partee
Josh Partee

The success of the Christenson Electric Headquarters renovation is because of, not despite, the challenges that arose during design. These challenges encouraged the project team to be strategic with space planning and creative when developing ways to shape a bright and inviting environment. Now complete, this office facilitates the company’s collaborative culture, meets modern demands, and is adaptable enough to remain flexible for the future.  

photo_credit Josh Partee
Josh Partee

The addition’s entryway and lobby, the courtyard and adjoining breakroom, a new training room, and flexible collaboration spaces all serve in prioritizing staff experience, a primary project goal.

photo_credit Josh Partee
Josh Partee
Products Behind Projects
Product Spotlight
News
Pricegore revitalizes a 1960s brutalist terrace in London’s Chelsea district
30 nov 2023 Notizie
Pricegore rivitalizza una terrazza brutalista degli anni '60 nel quartiere londinese di Chelsea

Lo studio di architettura londinese Pricegore ha rivitalizzato una villetta a schiera modernista nel... Altro

Detail: Thatch enclosure of the 'Tane Garden House', Vitra Campus
30 nov 2023 Dettaglio
Dettaglio: Recinto di paglia della "Tane Garden House", Vitra Campus

ATTA-Atelier Tsuyoshi Tane Architects ha completato un edificio ricoperto di paglia con un'impronta... Altro

Park Fort Krayenhoff by Orange Architects draws inspiration from the past
30 nov 2023 Notizie
Il parco Fort Krayenhoff di Orange Architects trae ispirazione dal passato

Lo studio di architettura Orange Architects di Rotterdam ha progettato il Park Fort Krayenhoff, un c... Altro

10 office buildings with insulated double-skin facades
29 nov 2023 Specifiche
10 edifici per uffici con facciate isolate a doppia pelle

Una facciata a doppia pelle isolata è composta da due strati. Nella maggior parte dei casi, q... Altro

AART’s new mixed-use Nicolinehus development contributes to urban life in Aarhus
28 nov 2023 Notizie
Il nuovo edificio a uso misto Nicolinehus di AART contribuisce alla vita urbana di Aarhus

Nicolinehus è un prodigioso complesso a uso misto progettato dallo studio di architettura sca... Altro

25 best architecture firms in India
28 nov 2023 Notizie
25 migliori studi di architettura in India

L'architettura indiana è un complesso arazzo intessuto di fili di cultura, storia e spiritual... Altro

Detail: The material essence of Liuba multifunctional service center
24 nov 2023 Dettaglio
Dettaglio: L'essenza materiale del centro servizi multifunzionale Liuba

Shulin Architects ha completato un centro servizi multifunzionale nella contea di Liuba, nel sud-ove... Altro