製品スペックシート

エレメントブランド商品名
メーカーROCKWOOL International A/S
メーカーCRL
メーカーKingspan Group
メーカーKawneer
メーカーBoon Edam
メーカーKnight Wall Systems

製品スペックシート
メーカー
メーカー
CRL さんの
メーカー
Kingspan Group さんの
メーカー
Kawneer さんの
メーカー
Boon Edam さんの
メーカー

Catalysts Building

MGA - Michael Green Architecture 建築家 として

The Catalyst Building is the first office building in Washington State constructed out of cross-laminated timber. It is pursuing Zero Energy and Zero Carbon certification by International Living Future Institute, making it one of the largest buildings in North America to meet both standards. The building intends to be a fully integrated living laboratory for new sustainability technologies, materials, construction techniques, operational practices, and design. 

                                                                                              

Located in Spokane, Washington, the 165,000 sq. ft., 5-storey Catalyst Building is built on an irregular site, which was underutilized and in need of revitalization. The building is connected to the University District by way of the Gateway Bridge – a pedestrian bridge that brings together the two university core areas. Intended as a place where industry and academia can intersect to innovate and collaborate, the building required flexible spaces for both office and academic multi-functional uses. The floor plates were designed to be simple but long span to meet the program requirement.

 

The ambition of the project team was to design and construct a mass timber building that could exceed the performance of a comparable steel and concrete building while showcasing the benefits of CLT concerning aesthetics, building efficiency, and environmental impact. This goal was realized through sustainable MEP design, smart building management systems, and the use of over 4,000 cubic meters of both CLT and glulam products, which have stored 3,713 metric tons of carbon dioxide. The CLT panels used in the building were sourced from local working forests, harvested using sound ecological practices, and manufactured 15 miles from the site. 

 

A Life Cycle Assessment (LCA) of the building, authored by the Carbon Leadership Forum at the University of Washington, concluded that the carbon storage of the timber nearly offsets the embodied carbon impact of construction. By focusing on lower-carbon materials, the conversation around sustainability in the built environment can broaden from only energy usage to total carbon emissions over a building’s lifecycle. This project proves that sustainable development outcomes and new construction methods can coexist with more traditional metrics for affordability, operational efficiency, and tenant comfort.

 

Passive-first” strategies include rainwater capture reducing water use, envelope design using Passive House standards, and durable material application to achieve a design life expectancy of 75 years. The building’s airtightness test results were outstanding with Catalyst’s building envelope performing at three times the airtightness required for the Passive House Standard. The Catalyst also draws from a centralized energy plant through a model called an eco-district. 

                                

The Catalyst Building symbolizes both Spokane and Washington State’s commitments to sustainability, and it serves as a hub for growth in the region. 

 

Materials used:

  1. Katerra
  2. Structurlam
  3. Western Arch Rib
  4. My TiCon
  5. Kingspan
  6. Rockwool
  7. Shildan
  8. Vaproshield
  9. Sansin
  10. Knight Wall
  11. Maxxon
  12. Kawneer

でストーリーを読むEnglishPortuguêsFrançaisItalianoEspañolDeutsch

Products Behind Projects
Product Spotlight
ニュース