BUILDING REFURBISHMENT FOR MUNICIPAL OFFICES

1004arquitectos as Architects

Torrelavega City Council intends to create a space for the contact between the administration and the citizen that will temporarily become the main headquarters of the City Council, housing a multipurpose room that will be used as a plenary hall; and the citizen service office, capable of meeting the different needs of citizens (statistics, registration, etc.). In addition, the mayor's office will be accommodated along with the offices of the municipal groups. It will also have a meeting or press room.

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

The proposal seeks to enhance the public function that will be carried out by the building to be refurbished, the former headquarters of the Torrelavega Chamber of Commerce. The simplification of the program and its circulations, accessibility and easy reading for the citizen, as well as its clear and effective internal organization are the guiding strategies of the proposal. Furthermore, the possible temporality of its use as the main headquarters of the City Council makes it necessary to consider an intervention that is versatile, flexible and open enough to host future compatible programs.

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

Intervening on a historic building in the city, the proposal is based on respect and enhancement of its structural and spatial configuration, its exterior envelope and its most significant elements. The structural and spatial configuration of the original project for the building was defined by the clear distribution of a central core flanked by two side wings. This configuration was damaged by the execution of a rear volume that distorted the geometric and symmetrical purity of the project and by the introduction of a second service staircase that broke the structural axis that separated the central core from the north wing. The proposal tries to recover the original configuration by eliminating the second staircase (originally for service), unnecessary both for use and by regulations. By eliminating this staircase, the original configuration of the building is restored by recovering the structural and spatial axes that divide the core and adjacent spaces.

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

This configuration also allows the restoration of the original distribution of the building in which the staircase and toilets were concentrated in the central core. A single core that combines the staircase, elevator and toilets is now located at the centre of gravity of the building. In this way, it structures vertical communication, as well as the connection between the two wings of the building.

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

The rear volume is maintained to house the elevator and enable this volume as a secondary exit from the building on the ground floor, which is required by regulations. The rear volume will now be connected to the main hall by opening a large gap in the rear wall of the building. This opening unifies the original exit from the building with the different openings that have been made over the years. In turn, the façade of the rear volume will be glazed so that a visual continuity is produced that connects both façades of the building.

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

Team:

Architects: 1004arquitectos

Facilities: SUMA ingeniería

Structure: A-GATEIN 

Photographer: Josema Cutillas

photo_credit Josema Cutillas
Josema Cutillas
photo_credit Josema Cutillas
Josema Cutillas

Materials Used:

Facade cladding: KEIM
Flooring: ECO-CERAMIC, TARKETT
Windows: TECHNAL
Interior furniture: FORMA5

photo_credit Josema Cutillas
Josema Cutillas
Project Credits
Project Spotlight
Product Spotlight
News
New psychiatric clinic in Tampere, Finland provides example of “healing architecture”
13 Jan 2025 News
New psychiatric clinic in Tampere, Finland provides example of “healing architecture”

Danish architectural studio C.F. Møller Architects worked in collaboration with Finnish studi... More

Kirkland Fraser Moor adopts biophilic approach to design of picturesque Foxglove House
10 Jan 2025 News
Kirkland Fraser Moor adopts biophilic approach to design of picturesque Foxglove House

Multidisciplinary architectural studio Kirkland Fraser Moor (KFM) has adopted a biophilic approach t... More

25 best architecture firms in Vietnam
10 Jan 2025 News
25 best architecture firms in Vietnam

Vietnam occupies the eastern edge of Southeastern Asia and boasts a diverse landscape of mountains,... More

25 best carpet, carpet tile and rug manufacturers
10 Jan 2025 Specification
25 best carpet, carpet tile and rug manufacturers

Carpets, carpet tiles, and rugs add elegance to interiors while providing comfort and warmth. These... More

SOA Architekti designs new fire station with a down-home sensibility and contemporary flair
8 Jan 2025 News
SOA Architekti designs new fire station with a down-home sensibility and contemporary flair

Architectural studio SOA Architekti has completed a new fire station in Dolní Jirčany, a vill... More

Temperaturas Extremas designs tree-like water reservoir with bird nests in Luxembourg City
7 Jan 2025 News
Temperaturas Extremas designs tree-like water reservoir with bird nests in Luxembourg City

Spanish architectural studio Temperaturas Extremas has designed a bird and mammal refuge and water r... More

New bioenergy heating plant by Kivinen Rusanen Architects combines industrial vigor and high energy efficiency
6 Jan 2025 News
New bioenergy heating plant by Kivinen Rusanen Architects combines industrial vigor and high energy efficiency

The Vuosaari bioenergy heating plant is the most recent addition to the Vuosaari power plant site, l... More

Archello houses of the month - December 2024
3 Jan 2025 News
Archello houses of the month - December 2024

Archello has selected its houses of the month for December 2024. This list showcases 20 of the... More