The project involved the expansion of the municipal cemetery of the Municipality of Spigno Saturnia Lot 2B with the creation of n. 39 new niches.
Specifically, n. 1 reinforced concrete body inside which the following were positioned respectively:
N. 5+3 niches in prefabricated reinforced concrete oven battery on three levels
The niches were arranged inside the reinforced concrete body. throw yourself into the work.
The finishes consist of exposed reinforced concrete with earth tones and placement of travertine headstones anchored to the structure by bronze studs in correspondence with the niches of the niches.
Flashings and descenders are made of pre-painted aluminium.
Year of construction 2022.