Hyparschale Magdeburg Reopened
Marcus Bredt

Hyparschale Magdeburg Reopened

gmp · von Gerkan, Marg and Partners Architects como Arquitetos

Conversion and Refurbishment to Conservation Standard by gmp

The Hyparschale in Magdeburg, built in 1969 to a design by Ulrich Müther, was ceremonially reopened on June 20, 2024.  After standing vacant for over twenty years, and following the commission by the authorities of the state capital of Magdeburg, the badly dilapidated concrete shell structure was comprehensively restored and converted from 2019 to 2024 to plans by gmp · von Gerkan, Marg and Partners Architects. The focus of gmp’s design has been on retaining the spatial effect of the shell roof and on reviving the building, which was listed as a historic monument in 1998, as a multifunctional venue for events and exhibitions. As a result of the new functional concept combined with conservation requirements the “new” Hyparschale is a guiding example of the preservation and modernization of additional works by Müther as well as other buildings from the post-war era. 

photo_credit Marcus Bredt
Marcus Bredt

The structural design of the Hyparschale on the eastern bank of the river Elbe, by structural engineer Ulrich Müther (1934 – 2007), consists of four hyperbolic paraboloids. The regular double-curved roof surfaces cover an area of 48 x 48 meters without any columns inside the hall, making this multipurpose hall from 1969 one of the largest buildings of its kind still in existence. 

photo_credit Marcus Bredt
Marcus Bredt

The new structures inside the hall, which follow Müther’s square grid design, enhance the experience of the open space beneath the curved roof. In order to create the detailed room schedule requested by the by the authorities of the state capital of Magdeburg, the design includes four cubes in the corners of the hall, each with a floor area of 15 x 15 meters.  The galleries on these cubes are linked by bridges. The flexibly usable layout creates smaller rooms that can be combined for events, seminars, exhibitions, and eateries, accommodating up to 500 people in the center of the hall.

photo_credit Marcus Bredt
Marcus Bredt

The concrete shells were repaired and upgraded using carbon reinforced concrete, thereby not only restoring the structural strength of the roof but also increasing it. Additionally, the rooflights running between the shells were reopened. These were originally filled with glass bricks but were closed shortly after the building’s completion due to leakages.

photo_credit Marcus Bredt
Marcus Bredt

In terms of construction and design, the new interior structures are reminiscent of the original external facade with its vertical emphasis and industrial steel and glass materials. The new transparent glass facade opens up views to and from Rotehornpark -the city park in the center of Magdeburg-  and replaces the former translucent industrial glazing while retaining the original facade structure. 

photo_credit Marcus Bredt
Marcus Bredt

Team:
Client: The state capital of Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement (Department for Communal Facilities Management)

Design 1969: Ulrich Müther, in cooperation with Horst Freytag
Building Work 1969: Gerling & Rausch KG

Conversion Design: Meinhard von Gerkan and Stephan Schütz with Christian Hellmund.
Project Leads: Sophie von Mansberg, Ursula Köper
Team: Rosaria de Canditiis, Jan-Peter Deml (Visualizations) Annett Fabian (BIM), Florian Illenberger, Sonja Kautz, Annette Löber, Bao Wangtao, Maria Wolff, Thilo Zehme (Visualizations), Aaron Zuber
Site Supervision (gmp): Moritz Buchholz, Jessica Neumann, Christoph Rohner, Viktor Saib, in cooperation with A.BB Architects, Rudolf Droste

Structural Engineering / Fire Protection: Prof. Rühle, Jentzsch & Partner, Dresden
MEP: Haupt Ingenieurgesellschaft, Leipzig; Ingenieurbüro Elektrotechnik Dipl.Ing. Andreas Kist, Burg
Lighting Design: Lichtvision Design, Berlin
Acoustics Engineering: ADA Acoustics & Media Consultants, Berlin
Guide System: Moniteurs GmbH Communication Design, Berlin
Highways, Civil Engineering, Drainage Technology: IKM Ingenieurkontor Magdeburg
Building Physics: Kriegenburg Consulting Engineers, Magdeburg; ITG Energieinstitut GmbH, Magdeburg 
Carbon Concrete Technology: CARBOCON, Dresden

Photographer: Marcus Bredt

photo_credit Marcus Bredt
Marcus Bredt
Caption
Caption
Products Behind Projects
Product Spotlight
Notícias
Open Architecture designs conical Sun Tower as a “cultural lighthouse”
12 nov. 2024 Notícia
A Open Architecture concebe a Torre do Sol cónica como um “farol cultural”

A Open Architecture, com sede em Pequim, concluiu a Torre do Sol, uma instalação cultu... Mais

Midland Metropolitan University Hospital sets new standard for clinical healthcare design
11 nov. 2024 Notícia
O Midland Metropolitan University Hospital estabelece um novo padrão para a conceção de cuidados de saúde clínicos

Os ateliers de arquitetura HKS, Cagni Williams e Sonnemann Toon concluíram o Midland Metropol... Mais

EovaStudio uses Baguette Oval glazed terracotta facade from Tempio in sports pavilion renovation
7 nov. 2024 Notícia
EovaStudio utiliza a fachada de terracota vidrada Baguette Oval da Tempio na renovação de um pavilhão desportivo

O gabinete de arquitetura EovaStudio, com sede em Sevilha, renovou e melhorou um pavilhão des... Mais

Porseleinen Hof by Orange Architects connect modern architecture with the city’s industrial past
6 nov. 2024 Notícia
Porseleinen Hof, da Orange Architects, liga a arquitetura moderna ao passado industrial da cidade

Porseleinen Hof, da Orange Architects, é um empreendimento habitacional inovador em Delft (NL... Mais