The proposed solution avoids contaminated own decision-making solutions has been carried out and some of the following points:
1 Null condition Park 2 Lack of access to crosses between the station and existing roads 3 Maintenance of existing vehicle parking 4 Enhancing intermodal 5 green roof on the first floor for public use 6 Possibility of future expansion
Semi-underground station with 25 basins. Large longitudinal openings on both sides to facilitate natural ventilation of the bus zone. Thus underground feeling disappears. This proposal intermodal power with the confluence of several modes of transport: bus, tram and high speed train. The building has a main hall that is a major north-south linear space high-rise that is accessed , protected by a canopy.
The cover of the first floor is equipped as a public space, with sitting areas, terraces, vegetation and street furniture.