Operational Emissions / Energy

Energy Negative

The calculations are based on input from the energy simulations in ”Rapport preliminär energiberäkning bygghandling, rev 20200612”. However, the energy simulation does not include a heat pump installed in the building which reduces the heating demand. The heat pump is owned by Skellefteå kraft but is installed with an EPC type concept (with the ownership of the heat pump changing over time). Based on information from Skellefteå kraft the heat pump is designed to cover approximately 90% of the heating demand with an average COP of approximately 3,5. This results in a decreased district heating demand of 1623 MWh/år and an increased electricity demand of 464 MWh/år (compared to the demand in the energy simulation).