Sustainability Report
Embodied carbon
The project documentation provides a 60-year whole-life embodied carbon estimate of 69 kg CO₂e/ft² or 743 kg CO₂e/m².
This includes:
- Substructure
- Superstructure
- Enclosure
- Interior materials
- MEP systems
The project states that this was a high-level estimate using C.Scale.
The project incorporates wood-based materials that store biogenic carbon and incorporates multiple carbon-reduction strategies and documents a whole-life embodied carbon assessment. The principal strategies were:
- Structural wood roof decking to reduce reliance on more carbon-intensive structural materials.
- Wood exterior cladding, including charred wood and cedar.
- Reduced cement content in concrete mixes to lower concrete-related embodied emissions.
- Reduced interior finish materials, limiting material quantities and associated emissions.
- Multi-functional spaces, reducing the amount of dedicated floor area and potentially avoiding additional materials.
- Long service-life approach, with an estimated building service life of 100 years.
- Healthier, lower-impact interior materials, including biobased carpet, PVC-free rubber wall bases, low-VOC finishes, and furniture without flame retardants
Operational Emissions / Energy
The project uses a strong combination of passive design and efficient all-electric systems:
- All-electric building, eliminating on-site fossil-fuel combustion.
- Ground-source heat pump system connected to a horizontal geothermal field.
- Radiant flooring for heating and cooling.
- High-performance building envelope.
- Energy recovery ventilator (ERV) with variable-speed pumping.
- LED lighting.
- Daylight access and lighting controls.
- Full-height glazing and orientation to increase useful daylight.
- Exterior sunshades and fritted glazing to control solar gains.
- Operable windows in dorm rooms.
- Destratification fans in the apparatus bay.
- PV-ready infrastructure, including roof, structural capacity, and electrical systems capable of supporting a 64 kW photovoltaic array
Service and maintenance emissions
Several design decisions are likely to reduce replacement, maintenance, and associated lifecycle emissions.
- Long service-life design: estimated building service life of 100 years.
- Durable exterior materials: wood cladding, anodized aluminum, and high-performance glazing.
- Reduced interior finish materials, decreasing the number of materials requiring future replacement.
- Biobased carpet installed without adhesives, potentially simplifying replacement and reducing material use.
- PVC-free rubber wall base rather than vinyl.
- Low-VOC materials and durable interior finishes.
- Sedum green roofs and native landscaping, designed as low-maintenance landscape systems without permanent irrigation.
- Multi-functional spaces, reducing the need for additional dedicated rooms and future alterations.
- Flexible-use components, including a training tower that also functions as circulation and training space, and a retention pond used for both stormwater management and rescue training.
Afterlife
The strongest documented circular strategy is the use of multi-functional and reduced-material design, rather than a comprehensive design-for-disassembly strategy. The project includes several flexible and multi-purpose spaces:
- The classroom/community room also serves as an ICC 500-compliant community storm shelter and emergency operations center.
- The hose-drying tower doubles as a technical training stair and mezzanine.
- The first-floor circulation zone also functions as reception space and a fire department history display.
- The retention pond serves both stormwater management and ice-and-water rescue training.
- Several spaces serve dual functions to reduce resource consumption and embodied carbon.
However, some elements have potential advantages:
- Wood decking and cladding are potentially more recoverable than composite or heavily bonded assemblies, depending on fixing methods.
- Biobased carpet with no adhesives is a particularly relevant strategy because adhesive-free installation can simplify future removal and replacement.
- Pre-vegetated modular green-roof assemblies are modular components, which may allow localized removal and replacement.