Embodied carbon

Efficient

Documented strategies with potential embodied-carbon benefits include:

  • The building uses a relatively restrained material palette, including cream-city brick and board-and-batten cladding.
  • Value engineering was undertaken in response to construction-cost increases, requiring the design team to reassess the building while retaining the geothermal and solar systems identified as sustainability priorities.
  • The building's long-term flexibility can reduce the likelihood of major future alterations as program requirements change.
  • Future expansion capacity was considered in the building and site planning, including the photovoltaic infrastructure.

Operational Emissions / Energy

Efficient
14.6
kg CO₂e/m²

Actual energy benchmarking has been conducted following occupancy rather than relying solely on predicted performance.

Measured operational energy:

The 2025 HGA benchmarking reported:

25 kBtu/ft²/year without solar PV.

17 kBtu/ft²/year with solar PV.

Solar generation offset approximately 34% of the building load. For the 31,257 ft² building, 17 kBtu/ft²/year corresponds to approximately 155,700 kWh/year of energy use. Using the reported 34% solar offset, approximately 102,800 kWh/year would remain supplied by the grid.

Using an EPA eGRID RFC West electricity factor of approximately 413.3 kg CO₂/MWh, this corresponds to an estimated 42,500 kg CO₂/year, or approximately 14.6 kg CO₂/m²/year of location-based operational electricity emissions after the reported solar contribution.

The project has a comparatively well-documented operational-energy strategy:

  • 42-well geothermal bore field for heating and cooling.
  • Electric heat pumps rather than fossil-fuel combustion equipment.
  • No natural-gas connection, resulting in zero on-site combustion emissions.
  • 129 photovoltaic panels / 61.92 kWdc of installed solar capacity.
  • Efficient windows and lighting.
  • Extensive daylight access through strategically oriented glazing.
  • Water-conserving plumbing fixtures.
  • Future capacity for additional photovoltaic generation.

Service and maintenance emissions

Efficient

Several design decisions can reduce future operational and maintenance requirements:

  • The geothermal system replaces conventional fossil-fuel heating equipment and associated fuel infrastructure.
  • The all-electric approach simplifies the building's energy supply by eliminating natural-gas infrastructure.
  • The brick base and exterior cladding provide durable enclosure materials.
  • The open and flexible floor plan allows spaces to change function without requiring extensive reconstruction.
  • The photovoltaic system was designed with additional capacity for future expansion, reducing the need to redesign the basic solar infrastructure when generation is increased.
  • Energy benchmarking during the first year of operation provides a mechanism for identifying operational adjustments and improving system performance over time.

Afterlife

Adaptive reuse was not the primary strategy because the project is a new-build library replacing an undersized downtown facility, but some measures support flexibility:

  • Meeting rooms can potentially be converted into office areas and vice versa.
  • The open second-floor arrangement supports changing library functions.
  • The children's collection and program room can be combined through a sliding glass door.
  • The site and building were planned to accommodate future expansion.
  • The photovoltaic system has structural and inverter capacity for additional solar panels.

Key products in low carbon design