Sustainability Report
Operational Emissions / Energy
For the project to transforma this former railway signal box into a kiosk-bar, 100 % of the existing building's load-bearing structure was preserved.
For the project to transforma this former railway signal box into a kiosk-bar, 100 % of the existing building's load-bearing structure was preserved.