Sustainability Report
Embodied carbon
Low Carbon
Sustainability information is provided by Studioshaw founder Mark Shaw.
- The concrete was supplied by Capital Concrete from its batching plant on the A12, around 500 metres from the site. The substructure and upper floors used a mix with a high proportion of GGBS, replacing between 40 percent and 50 percent of the cement. The reinforcement for the concrete frame and the piles is UK CARES certified steel made in an electric arc furnace, with a recycled content of 97.8 percent.
- The secondary facades are clad in Rieder fibreC, a 13mm glass fibre reinforced concrete panel. Rieder's published data puts its manufacture at under 20 kgCO2e per square metre of facade, compared with a typical 35 to 45 kgCO2e/m² for the bricks and mortar of a traditional kiln-fired brick outer leaf.
- The sustainability team at AECOM carried out a RIBA Stage 6 Whole Life-cycle Carbon Assessment in line with London Plan Policy SI 2, the RICS Professional Statement, and BS EN 15978. It covers the whole building — 4,932 square metres of floor area — over a 60-year reference period. The assessment uses the contractor's as-built quantities and specifications, so it records what was actually built, where most assessments rely on design stage estimates. The superstructure accounts for 51 percent of the building's embodied carbon, and the upper floors are the largest part of that. Exposing the frame removed the need for a separate cladding system and its supporting structure. The concrete serves as both the structure and the finished facade, and that decision, together with the low-carbon concrete mix, is a large part of why the upfront carbon came in so far below the benchmark.
- AECOM's Stage 6 assessment measured the upfront embodied carbon (modules A1 to A5) at 488 kgCO2e/m². That is well within the GLA benchmark of 850 kgCO2e/m² and it also meets the GLA aspirational benchmark of 500 kgCO2e/m². The planning stage assessment in 2022 estimated 1,070 kgCO2e/m², so the as-built figure is 54% lower. AECOM attributes most of that reduction to the GGBS mix and the recycled reinforcement. The assessment applied the standard default delivery distance of 20 km for ready-mix concrete, so the real figure is likely to be lower again. Over the 60-year life of the building (modules A to C, excluding operational energy and water), the total is 889 kgCO2e/m², against a GLA benchmark of 1,200 kgCO2e/m².
Operational Emissions / Energy
Efficient
- The apartments are heated by air source heat pumps.
- Passive measures are built into the architecture. The deep inset balconies shade the apartments from high summer sun and the commercial frontages at ground and lower ground floor sit back within a colonnade. During this year’s summer heatwave (2026) the internal spaces stayed noticeably cooler and out of direct sunlight. We have not yet carried out post-occupancy energy or overheating monitoring, as the building is still only partly occupied — we intend to commission it as soon as possible.
- The same colonnade gives the public a sheltered route along the edge of the building, facing a new public square and the Hertford Union Canal.
Service and maintenance emissions
The stainless steel balustrades and handrails require no painting and, together with the exposed concrete, help minimise maintenance over the building's lifespan, in line with Studioshaw's Re:Low principles. (https://www.studioshaw.co.uk/practice/)
Key products in low carbon design