Archello Awards 2025: Open for Entries! Submit your best projects now.
Archello Awards 2025: Open for Entries!
Submit your best projects now.

Aquatic Center Christine Caron - INSEP

Aquatic Center Christine Caron - INSEP
Takuji Shimmura, Cyrille Weiner

Aquatic Center Christine Caron, INSEP (The National Institute of Sports and Physical Education)

The Aquatic Center gathers 4 disciplines: swimming, water polo, diving and synchronized swimming. The main building and its extension’s roof tapers in long lower eaves to gradually and discretely blend into the Bois de Vincennes. In continuation of the pools, landscaped slopes indicate the building’s belonging to the Bois.


The structure unfolds in a horizontal origami style, which pleatings and cuttings form a sawtooth roof determining the lighting of the Pool Hall. Servant spaces are shared in a refined and airy clapboarded volume, in connection with the Sports Hall. The Aquatic Center is a pilot operation for the HEQ certification of swimming-pools.


3 pools, 2 buildings, 1 aquatic center The main building and its extension are linked by the ground continuity, by the roof and by their relationship with the Bois de Vincennes.


The black wall, as a common thread, goes from the synchronized swimming pool to the swimming pool. It holds the ventilation required for defogging the windows.


The grassy slope marks the belonging of the new aquatic stadium to the Bois de Vincennes.


Material Used :

1. Concrete / steel structure

2. Facade curtain wall aluminium + glass

3. Véture clins vertical woods (larch)

4. Ceiling wood blade, LIFTEAM

5. Stainless steel basin, MYRTHA POOLS

6. Soft ground

7. Floor tile

8. Couverture shed bacs aluminium, KALZIP

Project credits

Product spec sheet

Couverture shed bacs aluminium
Stainless steel basin

Project data

Año Del Proyecto
2015
Comparta o Agregue Aquatic Center Christine Caron - INSEP a sus Colecciones