Embodied carbon

Efficient

The principal embodied-carbon strategy was to retain and adapt the existing 1950s school building rather than demolish it and construct a replacement.

The architects extended the two existing classroom wings with lightweight timber-frame structures, adding another floor while making use of the existing building structure. Timber was selected for the new construction because of its lower associated carbon emissions compared with conventional reinforced concrete construction.

Before construction, Franz&Sue compared the costs and CO2 emissions of different structural systems. Their calculations indicated that a reinforced-concrete structure would have generated more than 123 tonnes of CO2e, while the selected timber construction achieved a reported saving of 313.5 tonnes of CO2e.

Concrete was therefore restricted to locations where it was structurally necessary. Additional material strategies included timber-frame external walls insulated with blown-in cellulose, lightweight timber partition walls, off-site prefabrication, and the retention of existing terrazzo flooring wherever possible.

Operational Emissions / Energy

Efficient

The project prioritises passive ventilation and indoor air-quality monitoring over a more energy-intensive mechanical ventilation solution.

Instead of installing an elaborate mechanical ventilation system, the architects introduced controlled night-time ventilation. This allows cross-ventilation between the terraces and classrooms, helping to remove accumulated heat and improve indoor air conditions.

CO2 sensors were installed in every classroom. When the concentration exceeds a predefined threshold, the sensors signal that manual window ventilation is required. Other relevant design decisions include:

  • Daylight: The new aula is covered by a shed roof, creating a spacious, naturally illuminated central space.

  • Natural ventilation: Cross-ventilation between terraces and classrooms supports passive air exchange.

  • Night-time cooling: Controlled night ventilation helps reduce indoor heat accumulation.

  • Indoor air monitoring: Classroom CO2 sensors indicate when additional ventilation is necessary.

  • Building adaptation: Retaining the existing structure avoids the additional material and construction impacts associated with complete replacement.

Service and maintenance emissions

The project incorporates several material and construction decisions that may support longer service life and reduce the need for frequent replacement.

The original building structure was retained and upgraded, extending the useful life of the existing construction. The new timber-frame walls and partitions were prefabricated off-site, supporting construction quality and reducing on-site material waste. The architects also selected durable materials for interior and exterior applications:

  • Existing terrazzo flooring was retained wherever possible, avoiding unnecessary replacement.

  • Linoleum flooring was installed on the upper floors.

  • Timber was used for facade elements, partition walls, and custom-made joinery.

  • Water-based coatings were used on the timber facade elements of the polytechnic school and wooden window fall-protection elements.

  • Felt acoustic panels were installed in classrooms to improve acoustic conditions.

Afterlife

Adaptive reuse was a fundamental principle of the project.

Rather than demolishing the existing 1950s middle school, Franz&Sue retained its original structure and adapted it to accommodate contemporary educational requirements. The two existing classroom wings were extended with lightweight timber-frame structures, adding another floor and creating four learning clusters. The new arrangement includes shared group rooms, loggias, central learning spaces, and multifunctional communal areas.

The former cramped courtyard was transformed into a large, naturally illuminated aula, providing a central meeting and gathering space. The learning clusters and shared spaces offer different possibilities for teaching, group activities, independent study, and informal interaction. The generous furniture provision by the City of Graz further supports the flexible use of these spaces.

 

The project incorporates several construction approaches that are compatible with resource efficiency and potentially support future material recovery. The new extensions use lightweight timber-frame construction, including prefabricated external walls and partition walls. Compared with conventional wet construction, prefabricated timber systems can offer greater potential for selective dismantling, component replacement, and material recovery. The use of timber for the new facade structures, internal partitions, and custom-made joinery also supports the use of renewable construction materials.

Key products in low carbon design

Marmoleum Walton
CO2
Marmoleum Walton
Forbo Flooring Systems
Marmoleum Decibel
CO2
Marmoleum Decibel
Forbo Flooring Systems
Marmoleum Cocoa
CO2
Marmoleum Cocoa
Forbo Flooring Systems