Graz-Puntigam Middle and Polytechnic School

A 1950s school reworked through adaptive reuse and timber construction

Applied products
View all applied products

Franz&Sue renovated a 1950s school building in Graz, Austria, through adaptive reuse, lightweight timber construction, and passive ventilation. The renovation creates a sunlit, three-storey aula that gives the building a spacious, workshop-like character. A generous furniture budget from the City of Graz also allowed the school's long corridors to be transformed into versatile common areas.

photo_credit David Schreyer
David Schreyer

 

As Franz&Sue partner Erwin Stättner explains, “Adapting and building into existing structures also presents new opportunities: large interior spaces like this aula are rarely possible in new buildings.”

 

Retaining and extending the existing school

“The renovation of the old, dark 1950s school has to be at least as good as our new primary school building next door.” This was the standard Franz&Sue set for the renovation of Puntigam Middle School. The City of Graz commissioned the project. Design work took place between 2022 and 2025, with construction carried out from 2024 to 2025.

photo_credit David Schreyer
David Schreyer

The main intervention involved extending the two existing classroom wings with an additional storey, clearing the cramped courtyard between them, and covering the resulting space with a shed roof. This created a naturally illuminated, three-storey aula with a spacious workshop character. The renovation and extension provide space for 350 students across 14 classes, with a gross floor area of 5,083 square metres and a net usable floor area of 4,585 square metres.

Applied Products block will be inserted here
photo_credit Franz&Sue
Franz&Sue

 

Timber construction and embodied carbon reduction

Retaining the original school structure was the project's primary strategy for avoiding the additional material consumption and construction impacts associated with demolition and replacement. For the new architectural interventions, Franz&Sue consistently selected timber as the principal construction material, using lightweight timber-frame structures to extend the classroom wings.

Before construction, the architects compared the costs and CO2e emissions of different structural approaches. Their calculations indicated that a reinforced-concrete structure would have generated more than 123 tonnes of CO2e, while the selected timber construction resulted in reported savings of 313.5 tonnes of CO2e. Despite the higher costs associated with timber, the environmental comparison helped convince the client to adopt this construction method. Concrete was used only where structurally necessary.

photo_credit David Schreyer
David Schreyer

The external walls of the extensions consist of timber-frame construction insulated with blown-in cellulose. Lightweight timber partition walls were also introduced on the new upper floor. Both wall systems were prefabricated off-site, supporting a more efficient construction process and reducing the extent of on-site building work. Timber was also used for custom-made joinery and other built-in elements.

The material approach extended to the existing building, where terrazzo flooring was retained wherever possible instead of being replaced. Linoleum flooring was installed on the upper floors, while felt panels in the classrooms provided acoustic treatment. The project was also supported by ecological building product management, with water-based coatings applied to the timber facade elements of the polytechnic school and the wooden window fall-protection elements.

photo_credit David Schreyer
David Schreyer
photo_credit David Schreyer
David Schreyer

 

Passive ventilation and indoor air quality

For operational performance, the architects opted for a low-tech ventilation approach rather than an elaborate mechanical ventilation system. Controlled night-time ventilation allows air to move between the terraces and classrooms through cross-ventilation, helping to remove accumulated heat and improve indoor conditions.

Each classroom is equipped with a CO2 sensor that signals when a predefined concentration threshold is exceeded and manual ventilation is required. This provides the school with a means of monitoring indoor air quality while relying on natural ventilation for additional air exchange. 

photo_credit David Schreyer
David Schreyer
photo_credit David Schreyer
David Schreyer

 

Flexible learning spaces

The renovation also reconsiders how the existing school accommodates different teaching activities. The two classroom wings were extended with lightweight timber structures and connected into four learning clusters through timber platforms.

Each cluster shares group rooms, loggias, and central learning and break areas. Multifunctional furniture, wooden boxes, and curtains help organise the different spaces for individual study, group activities, and informal interaction.

photo_credit David Schreyer
David Schreyer
photo_credit David Schreyer
David Schreyer
photo_credit Franz&Sue
Franz&Sue

The aula forms the central meeting place of the middle school. Two wooden tree sculptures establish its scale, functioning as large, three-dimensional bulletin boards. The surrounding after-school care centre, workshops, cloakroom, library, and staff offices connect different school activities around this shared interior space.

This arrangement extends the useful life of the existing school while accommodating changing educational requirements. 

photo_credit David Schreyer
David Schreyer
photo_credit Franz&Sue
Franz&Sue

The City of Graz has provided truly high-quality furnishings for this project. Not only did this greatly enhance our design process, we can also see how effectively the school community is putting these elements and open spaces to use. We never imagined the possibilities this would open up.

Lucie Vencelidesova, Franz&Sue team leader

 

Between the middle school and the existing gymnasium, the extension for the new polytechnic school also uses lightweight timber construction. The large windows of the middle school and the timber-slatted facade of the polytechnic school echo the design of the primary school's facade. With its shared school garden, the Puntigam education campus is now more closely connected spatially.

By retaining the 1950s structure, extending it with lightweight timber construction, and reorganising its interior around shared learning spaces, Franz&Sue addresses the school's changing spatial requirements while limiting the need for new structural materials.

photo_credit David Schreyer
David Schreyer
photo_credit David Schreyer
David Schreyer
Share or Add Graz-Puntigam Middle and Polytechnic School to your Collections