Sustainability Report
Embodied carbon
Low Carbon
From a Life Cycle Assessment of the as-built project:
- Total embodied carbon A-C is 7,555,837 kg CO2e.
- Total embodied carbon intensity is 399.78 kg CO2e/m2.
- The as-built hybrid mass timber/steel structure has 32 percent less embodied carbon than the baseline concrete structure.
- The total biogenic carbon for Limberlost Place was calculated to be 4,233,548 kgCO2e.
Operational Emissions / Energy
Low Carbon
Key products in low carbon design
CO2
ENNWALL-70
Ennova
CO2
Nordic X-Lam Cross-Laminated T...
Nordic Structures
CO2
Nordic Lam+ glued-laminated ti...
Nordic Structures
Share or Add Limberlost Place to your Collections