Project • By max-a Architecture + Landscape ArchitectureWarehouses

Cero K

From the architect: The project is located between San Carlos and Chillan, along Chile’s Route 5 South. The fast paced project was developed in four months and built in 8 months. Iansa is the principal producer, distributor and seller of sugar in Chile. The company was looking to house the production of their new sweetener Cero K. A 30 x 50 mts two-story 8.5mt high warehouse was the starting point to house the various programmatic requirements. The actual productive process in developing the sweetener became the core of the project resulting in a 4- story 14mt high central structure cladded in Transparent Alveolar Sunlite Polycarbonate that would pierce the main volume functioning both as an independent and cohesive element at the same t... More