Bim coordination

An overview of projects, products and exclusive articles about bim coordination

Project • By AEODC Inc • Apartments

La Brea, California

In brief, La Brea is a 6-story residential building comprising of 145 apartments with first floor dedicated for Parking, Entrance Lobby and Business Centre, followed by Apartments from Level 2 onwards. With 5 Stories of Type IIIA Construction over 1 Story of Type 1A above grade construction, project has an approximate area of 132,000 SF. Aeodc.inc Services OfferedWorking extensively in the west coast having a remarkable track record of successfully delivering BIM Enabled Projects, AEODC was awarded this project on recommendation to deliver the defined scope of work at LOD 300 with quick turnaround .i.e. within a time-frame of 6.0 to 8.0 weeks. The scope of work included in the project: Revit Modeling:Creating detailed 3D models of s... More

Project • By AEODC Inc • Distribution Centres

Porsche Dealership, Florida

In brief, the project involves the construction of a new Porsche dealership in North Miami, FL. The facility includes a two-level showroom connected to a six-level garage building, with dedicated service drive regions. According to the project documentation, the approximate area of the Showroom Building is 38,612 SF, the 6-floor Garage Building is 281,093 SF, and the Service Drive is 79,130 SF. Aeodc.inc Services OfferedAEODC was engaged to enhance the project’s Revit models and provide clash detection and coordination services to meet the specified scope and timeline. The scope of work included in the project: Revit Architecture and Structure Model Enhancement to LOD 400:Enhanced Model received at LOD300 to LOD400 using Autod... More

Project • By AEODC Inc • Residential Landscape

5201 Congress, Florida

5201 Congress | Located in Florida 5201 Congress Multi family project located in Florida with an approximate area of 664,000 SF comprises of primarily two buildings – Residential (8 Levels + Roof) and a Garage Building (6 Levels). Residential building comprises of both common recreation spaces and residential units at level 1, followed by level 2 onwards residential units only. Comprehensive BIM modeling and coordination services were integral to the project’s success, ensuring seamless integration of architectural, structural, and MEP systems. This meticulous approach minimized conflicts, optimized construction workflows, and reinforced 5201 Congress’s status as a Multi family apartments. Services Offered Being recomm... More

Project • By AEODC Inc • Residential Landscape

Metropolitan Coral, Florida

In brief, Project building comprises of 8 Story + Roof level. Ground level comprises of both residential units and common spaces, followed by level 2 onwards only residential units till level 8. Having total 12 different types of residential units making for total 204 units in the building, the approximate gross square footage of the building was 247,819 SF. Services OfferedHaving a remarkable track record of successfully delivering coordination projects and sheet preparation scope, AEODC was brought on board to deliver the defined scope with quick turnaround at LOD 350 within a tight 8.0 to 10.0 week time-frame. Aeodc.inc The scope of work included in the project: Revit Modeling:Creating detailed 3D models of the architecture, stru... More