Project • By OPN Architects • Power Plants
Ford/DTE Central Energy Plan
This new Central Energy Plant is at the core of a 10-year master plan to overhaul and modernize a major automotive manufacturer’s research and engineering campus.
Alex Michl, OPN Architects
Alex Michl, OPN Architects
The new facility fulfilled multiple initiatives: the replacement of an aging central steam system, distributed cooling assets with a 3,000 ton geothermal system, a 19,000 ton chilled water system, as well as low-temperature water-based energy distribution loops, 40,000 ton-hours of thermal energy storage, and on-site electrical generation via combined heat and power.
Alex Michl, OPN Architects
The design team used the latest in three-dimenional modeling software to navigate the complex web of MEP systems... More
Project • By United-BIM • Hotels
Fairfield Inn
Hospitality Project- Architectural, Structural, MEP Modeling | MEP Coordination | 3D Rendering
Fairfield Inn & Suites, located in Williamstown, MA is a new development of a 56,000 SQFT with 95 rooms on a two-acre land. The three-story brick building of this hotel is designed to fit with the architecture of Williamstown. Hotel’s red brick building echoes with the architecture of North Berkshire’s historic mills. We were assigned with the task of BIM implementation during hotel construction project. We are proud to successfully execution of BIM process consisting BIM Modeling and Coordination throughout the project.
BIM Services Provided:
Architecural BIM Modeling
Structural BIM Modeling
MEP-FP Model... More
Project • By United-BIM • Hotels
Boston Hotel - 3D Modeling and MEP Coordination
Effective BIM execution during the heritage hotel remodeling- 3D BIM modeling of architectural and MEP designs and coordination
About Project
When you set to redesign a 100+ years old heritage hotel, you know it's going be a challenging task. This remodeling project demanded accurate mapping of the existing building, creating of demolition plan and drawings and then redesigning of the new construction. Creating accurate As-build drawings required significant coordination between the cross-design models. The structure is a 5-story building with around 150 rooms into the new design. MEP coordination becomes a critical and important aspect of this project while remodeling any old structure.
BIM Services Provided:
BIM 3D Mod... More