Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

#corporativearchitecture

An overview of projects, products and exclusive articles about #corporativearchitecture

Project • By Estúdio MóduloOffices

Ágora Tech Park | Ágora UNI

The Ágora UNI, the third building in the Ágora Tech Park, connects two levels. The main entrance on Av. Perini provides access to the woodland. At this level, the quadruple-height atrium organizes the entrance, vertical circulation, and ground-floor programs. At the upper level, the canopy floor continues the north axis, connecting to the level of the buildings already constructed. The walkway frames views of the preserved forest on one side and the future woodland on the other, with restaurants along the route. Manuel Sá Manuel Sá Internally, the building is organized pragmatically, with a central corridor and offices occupying the perimeter. The layout is designed to accommodate rooms of different si... More

Project • By Estúdio MóduloOffices

Ágora Tech Park | Ágora MOB

The design of Ágora MOB, the second building in the Ágora Tech Park complex, connects two levels. The main entrance on Av. Perini cuts through the slope with concrete retaining walls and provides access to the preserved forest. At this level, the triple-height atrium organizes the entrance, vertical circulation, and the multipurpose room. At the upper level, the building continues the north axis, connecting to the elevation of the headquarters building. The walkway offers views of the preserved forest on one side and shops and cafés on the other. The building is enclosed by glass and perforated metal cladding on its east and west façades, with strategic openings marking entrances, common areas, and special rooms.... More