#projects
An overview of projects, products and exclusive articles about #projects
Project • By nos arquitectura • Offices
Notary Office in Delta del Ebro
The starting point of the project arises from a need to restructure a two-storey rectangular office building, with its short side along the street, the rest of the boundaries being dividing walls. The main objective of the project, given its small façade in comparison to the total area of the premises, was to provide all the spaces with natural lighting, with the intention of generating a pleasant space for work.
Javier Briones
As in classic atriums, the spaces are organized around a skylight that provides indirect overhead lighting that is ideal for the activity taking place.
Javier Briones
The program is distributed over two floors, with a double height in the central area that connects both levels, and allows natural... More
Project • By thinkspace • Offices
Cliffe Dekker Hofmeyr (CDH)
When CDH, one of South Africa’s leading law firms approached us to design their client-facing area and training facility on the ground floor of their building in Sandton, we were excited to produce an environment that would be a fitting representation of this illustrious 166-year-old company.
The client lounge is characterised by rich, warm timber, and small touches of mid-century detailing seen in the choice of the statement pendant over the coffee bar. We also included a contemporary take on wall paneling as well as a modern touch in the illuminated glass wall detail. Welcoming and warm, this area promotes a variety of different activities and levels of privacy in one space. The dining room, set in a tapered corner of the a... More
Project • By ASAS arkitektur • Primary Schools
Søbakken skole
The school is rehabilitated and expanded with wing G, which is a new building on 2 floors that accommodates 8 classrooms in addition to SFO. This together with previously rehabilitated pavilion D with 6 classrooms constitutes a two-parallel school. New wing F holds canteen which is also used as a meeting room, as well as kitchen and meeting rooms. The school facility is linked to dry and warm corridors where the children can travel easily between the various pavilions, including rehabilitated administration wing A and existing wing D. More