Waste Incineration and Powerstation Forsthaus
Georg Aerni

Waste Incineration Facility and Powerstation Forsthaus, Bern

Graber Pulver Architekten 建築家 として

Resembling a container ship anchored at harbor, the new building of the EZF is placed on the outskirts of Bern / To accommodate future changes in the process technology, the construction of the building needs to be durable and at the same time flexible / The base and waste bunker are made out of on-site concrete, the halls of the process technology are constructed as a tectonic shell out of pre-cast concrete elements / A 300m long public promenade leads along the side of the building / By allowing precise views into the process technology and its generous openings to the surrounding forest, the promenade establishes a relationship between “machine” and nature.

photo_credit Georg Aerni
Georg Aerni
photo_credit Georg Aerni
Georg Aerni
photo_credit Georg Aerni
Georg Aerni
プロジェクトクレジット
製品スペックシート

エレメントブランド
automatic door operatorDormakaba Group
lightingims Industrial Micro Systems AG
doorsLanz AG
doorsMeier Systems AG
製品スペックシート
automatic door operator
Dormakaba Group さんの
lighting
doors
Lanz AG さんの
doors
Meier Systems AG さんの
Project Spotlight
Product Spotlight
ニュース