New R&D Headquarters for Certest Biotec
Iñaki Bergera

New R&D Headquarters for Certest Biotec

IDOM als Architecten

Over the last few years, Certest's production and R&D development needs have grown exponentially. To accommodate this growth, IDOM has designed its new extensions as a continuation of its current headquarters in San Mateo de Gállego, Zaragoza, Spain. The new buildings reflect Certest's new growth strategies and represent a total of 15,620 m2 of new construction, which, when added to the existing buildings, form a total built-up area of 24,825 m2, making it one of the largest biotechnological complexes. 

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

Firstly, a building was designed to house the production facilities. This is known as Phase 5. The main objective and challenge was to create a large, versatile and flexible vessel that would allow Certest's new business units to be developed by creating new R&D and production laboratories. The building is structured around a central core of vertical communications, toilets, and a central courtyard. The courtyard is designed to naturally light and ventilate the floors.
To increase the flexibility of this Phase 5 building, a 2.5-metre-wide double skin has been designed around the perimeter of the building. This provides evacuation stairs and space for installation walkways. This double skin is formalized with Tramex walkways and an outer skin of green perforated folded metal sheets, which blend into the surrounding landscape of the Gállego river and minimize the visual impact of the large building.

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

A pioneering aspect of the design is the ability to assemble and disassemble the lightweight panel laboratories without affecting or modifying the main building, allowing the rapid creation of new production units or laboratories, as opposed to the usual time required to construct a new building. The building is designed so that the laboratory ducts are easily connected to the machines on the roof, either through the perimeter ring of the double facade in a concealed manner, or through the large central core that connects to the machine platform on the roof.

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

The built complex is completed with the construction of the phase 6 building, which is the corporate building and main façade at the image level of the built complex. It houses the general support services for Certest's main activity, being the administrative uses, changing rooms and canteen the most representative ones. 
The building's appearance is that of a large box with a metallic finish. To the south, the cantilever is flared to protect against the sun. In addition, this cantilever has been maximized on the west façade to create a covered plaza in the main access area on the ground floor. This large metal box rests on a recessed glass curtain wall. This defines and composes the ground floor.

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

In the basement, Phase 6 and Phase 5 are volumetrically linked by the dining room, which is an open space naturally lit by two courtyards to the east and west. On the ground and first floors, Phase 5 and Phase 6 are connected by closed walkways embedded in the façade modulations of the buildings.
The buildings have been designed to minimize energy consumption. Passive measures include the construction of double skin facades, courtyards that encourage natural ventilation and lighting, and eaves that are sized according to orientation and sunlight. Active measures include the installation of an open-loop geothermal system with active heat recovery, hot water production by means of a geothermal heat pump, a ventilation system with high efficiency heat recovery and a photovoltaic solar collection system. The installations also include chargers for electric vehicles.

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

The buildings have been designed to minimize energy consumption, using the best available techniques to improve their energy efficiency. Passive measures have been used in the construction of the building to reduce energy demand, such as the construction of double-skin facades, courtyards to encourage natural ventilation and lighting, and eaves sized according to orientation and sunlight. Active measures include the installation of an open-loop geothermal system with active heat recovery, domestic hot water production by means of a geothermal heat pump, a ventilation system with high efficiency heat recovery, and a photovoltaic solar collection system with a total installed capacity of 310 kW and a total annual energy production capacity of 469,859 kWh. Also noteworthy are the electric vehicle charging installations, with a charging capacity of 247.2 kW, confirming Certest's commitment to sustainability and innovation.

photo_credit Iñaki Bergera
Iñaki Bergera
photo_credit Iñaki Bergera
Iñaki Bergera

Team:

Client: CERTEST BIOTEC

Architects: IDOM

Project architects: José Angel Ruiz Gonzalez, Federico Pardos Auber

Other Participants: Alejandro López Pérez, Covadonga Celigueta Caso y Silvia Celorrio Soria

Costs: Jose Ángel Ruiz González
Luis Mingarro Montori

Engineering: Jorge Guillén Ferrer

Lighting: Fernando Catalán Herreros

Public Health Services: Jorge Guillén Ferrer

Electrical Engineering: Fernando Catalán Herreros

Telecomunications: Diana López Martínez

Fire Strategy: Diego Abril Sáez

Acoustics & Sustainability: Jorge Guillén Ferrer

CAD: Sergio Cubero Belenguer

Site Supervision: José Angel Ruiz Gonzalez, Federico Pardos Auber

Photographer: Iñaki Bergera

Builder: U.T.E. ACYC S.L.U. y EHISA S.A., INCLIZA S.L., 

Caption
Caption
Producten Achter Projecten
Product Spotlight
Nieuws
10 homes making use of straw bale construction and insulation
3 mei 2024 Specificatie
10 woningen die gebruik maken van strobalenconstructie en -isolatie

Stro heeft een lange geschiedenis als bouwmateriaal en wordt toegepast in rieten daken, als bindmidd... Meer

ATP architects engineers completes office building in line with “New Work” principles and sustainability goals
3 mei 2024 Nieuws
ATP architects engineers voltooit kantoorgebouw in lijn met "Het Nieuwe Werken"-principes en duurzaamheidsdoelen

ATP architects engineers heeft een duurzaam bedrijfs- en kantoorgebouw voltooid voor de Oostenrijkse... Meer

SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport
2 mei 2024 Nieuws
SOM voltooit “terminal in een tuin” op Kempegowda International Airport in Bengaluru

Het internationale en interdisciplinaire architectuur-, ontwerp- en ingenieursbureau Skidmore, Owing... Meer

Archello houses of the month - April 2024
1 mei 2024 Nieuws
Archello huizen van de maand - April 2024

Archello heeft zijn huizen van de maand voor april 2024 geselecteerd. Deze lijst toont 20 van de mee... Meer

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
30 apr. 2024 Nieuws
Zaha Hadid Architects' Zhuhai Jinwan Civic Art Centre weerspiegelt chevronpatronen van trekvogels

Het Zhuhai Jinwan Civic Art Centre, ontworpen door Zaha Hadid Architects, wordt gekenmerkt door de f... Meer

25 best metal cladding manufacturers
2 mei 2024 Specificatie
25 beste fabrikanten van metalen gevelbekleding

Metalen gevelbekleding kan functionaliteit combineren met esthetiek en tegelijkertijd voldoen aan ho... Meer