Ara Pacis Museum
courtesy of Richard Meier & Partners. Photography: Roland Halbe

Ara Pacis Museum

MeierPartners as Architects

This museum on the bank of the Tiber River has been designed as a renewed setting for the Ara Pacis, a sacrificial altar dating to 9 B.C. and now located on the western edge of the Piazza Augusto Imperatore. Planned as part of an effort to protect Rome’s cultural legacy, the new structure replaces the monument’s previous enclosure, which was in a state of advanced decay. The structure consists of a long, single-story glazed loggia elevated above a shallow podium providing a transparent barrier between the embankment of the Tiber and the existing circular perimeter of the mausoleum of Augustus, built circa 28 B.C.

 

The altar was relocated from the Campo Marzio in 1938 during the Mussolini era, and a system of regulating lines was applied to the project to relate the altar’s present position to its original site. Bisecting the distance between the present center of the mausoleum and the original site yielded a four-square urban grid that was used as a proportional frame to reorganize the piazza and its surroundings. An artificial obelisk is used as a historical reference on the north-south axis through the altar.

 

The clarity of the volumes and the building’s proportions relate in scale to Rome’s ancient structures. A predominating feature of the new building is a glass curtain wall measuring 150 feet long and 40 feet high. The asymmetrical entry hall, defined by seven slender columns in reinforced concrete finished with white waxed marble plaster, leads to the main hall, which houses the Ara Pacis. The contrast between the subdued lighting of the entrance space and the expansive top-lit and rigorously symmetrical main hall encourages a naturally progressive circulation. The roof over the main hall rests on four columns with skylights to maximize natural lighting and to eliminate “false shadows.” Outside the main structure, a low travertine wall extending from within the main hall traces the ancient shore of the Tiber River. Building materials include glass and concrete and an indigenous fine beige Roman travertine.


Although housing and protecting the ancient altar was the main focus of this museum, the building also provides space for temporary exhibitions and installations dedicated to archaeological themes and a state-of-the-art digital library of Augustan culture. An outdoor roof terrace above the auditorium functions as an essential part of the circulation of the museum and includes a contiguous bar and café with views over the Mausoleum of Augustus to the east and the Tiber River to the west.

 

Material used :

1. Travertine

2. Façade System by StoVerotec

3. Aluminum and glass curtainwall

4. Maple Veneer Panels

Project Credits
Product Spec Sheet

ElementBrand
ManufacturersTravertine
Façade SystemVerotec GmbH
Product Spec Sheet
Manufacturers
Façade System
Project Spotlight
Product Spotlight
News
Australia’s first solar-powered façade completed in Melbourne
12 Dec 2024 News
Australia’s first solar-powered façade completed in Melbourne

Located in Melbourne, 550 Spencer is the first building in Australia to generate its own electricity... More

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
11 Dec 2024 News
SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse

In the heart of Westminster, London, the London-based architectural studio SPPARC has restored and r... More

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
10 Dec 2024 News
Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals

Ryohei Tanaka of Japanese architectural firm G Architects Studio designed a bijou coffee stand in Ky... More

New building in Montreal by MU Architecture tells a tale of two facades
10 Dec 2024 News
New building in Montreal by MU Architecture tells a tale of two facades

In Montreal, Quebec, Le Petit Laurent is a newly constructed residential and commercial building tha... More

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 Dec 2024 News
RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin

Located on Georgetown University's downtown Capital Campus, the McCourt School of Policy by Robert A... More

MVRDV-designed clubhouse in shipping container supports refugees through the power of sport
9 Dec 2024 News
MVRDV-designed clubhouse in shipping container supports refugees through the power of sport

MVRDV has designed a modular and multi-functional sports club in a shipping container for Amsterdam-... More

Archello Awards 2025 expands with 'Unbuilt' awards categories
9 Dec 2024 Archello Awards
Archello Awards 2025 expands with 'Unbuilt' project awards categories

Archello is excited to introduce a new set of twelve 'Unbuilt' project awards for the Archello Award... More

Kinderspital Zürich by Herzog & de Meuron emphasizes role played by architecture in the healing process
6 Dec 2024 News
Kinderspital Zürich by Herzog & de Meuron emphasizes role played by architecture in the healing process

The newly completed Universtäts - Kinderspital Zürich (University Children’s Hospita... More