Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

C MIL Building Renovation

C MIL Building Renovation
photography Laurant Brandasj

A brutalist military building renewed through subtraction and reuse

Applied products
View all applied products

Located at the highest point of the green belt around Brussels, C MIL Building Renovation by Castor Fiber Architecture Studio transforms a former brutalist military building into a contemporary home and office. Defined by raw concrete, a circular plan, and expansive views, the project approaches the structure as a resource to be refined rather than replaced. Its sustainability strategy is rooted in adaptive reuse, using the building’s inherited form, material character, and structural logic as the basis for a new domestic and working environment.

photo_credit photography Laurant Brandasj
photography Laurant Brandasj

 

Reuse through subtraction

Strict zoning regulations prohibited extension, leading to a design strategy based on subtraction rather than addition. Under the principle of ‘to create is to delete’, the project removes non-load-bearing interior walls to open the plan and recover the spatial potential of the circular structure. This approach reduces material consumption and avoids the environmental cost of demolition and new construction. By working within the existing envelope, the project preserves embodied energy.

photo_credit photography Laurant Brandasj
photography Laurant Brandasj
Applied Products block will be inserted here

Envelope performance and material continuity

The renovation improves performance while maintaining the building’s brutalist identity. The exterior is upgraded with insulated external plaster that visually recalls raw concrete, allowing the façade to retain its original character while improving thermal efficiency. Steel-look windows reinforce the industrial language of the building while supporting contemporary standards of comfort and enclosure.

At the base, shou sugi ban charred wood provides a darker, more tactile finish that anchors the building within the surrounding nature reserve. This use of charred timber introduces durability, weather resistance, and a visual transition between the rough exterior setting and the refined interior environment.

photo_credit photography Laurant Brandasj
photography Laurant Brandasj
photo_credit photography Laurant Brandasj
photography Laurant Brandasj
photo_credit photography Laurant Brandasj
photography Laurant Brandasj

 

Light, landscape, and passive spatial quality

A major intervention occurs on the patio side, where walls are replaced with floor-to-ceiling glazing. This brings daylight deep into the plan and establishes a strong relationship with the central garden. The contrast between the outward-facing façade and the inward-facing glass circle creates two distinct environmental conditions: a protective outer edge facing wild nature and an open interior edge oriented towards a carefully organised courtyard. The circular plan supports continuous movement, clear sightlines, and even daylight distribution. Hidden sliding doors allow spaces to be compartmentalised when needed without compromising openness.

photo_credit photography Laurant Brandasj
photography Laurant Brandasj
photo_credit photography Laurant Brandasj
photography Laurant Brandasj

 

Preserving character while extending life

Inside, original concrete pillars, brickwork, and vaults are retained and softened through an old cement-based paint technique. Utilities are exposed externally, avoiding damage to the existing interior fabric and reinforcing the honest material language of the building.

photo_credit photography Laurant Brandasj
photography Laurant Brandasj
photo_credit photography Laurant Brandasj
photography Laurant Brandasj

 

Project credits

Sustainability

EPB • A
2025
Efficient
Embodied carbon
Low Carbon
Operational Emissions / Energy
Low Carbon
Service and maintenance emissions
3
Key Low-Carbon Products

Product spec sheet

Manufacturers
Home automation systems
Manufacturers
Avantis 75 by Sapa Building System

Project data

Project Year
2025
Primary Building Material
Concrete
Share or Add C MIL Building Renovation to your Collections