Hellwies School Conversion and Extension

Hellwies School Conversion and Extension
Beat Bühler

Hellwies School Conversion and Extension, Volketswil

Applied products
View all applied products

Built in the 1970s, the existing school campus and its generous outdoor facilities are highly prised by students and teachers alike. Accordingly, the choice for the winner of a competition to expand the school was based on a solution that protected the grounds. The solution lies in vertically extending the existing buildings, creating an integrated mix of new and old.

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

The generous exterior space, well embedded in the landscape, is preserved in its entirety. The financial budget for the exterior spaces is to be fully used for their improvement. The prudent use of land resources, minimal use of grey energy in construction, and centralisation of the school complex make the concept of vertical densification a multifaceted sustainable strategy.

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

The design of the existing access road is a remnant of traffic-oriented urban development ideologies of the 1970s. With the relocation of the parking areas on Riedstrasse, traffic is removed from Hellwiesstrasse, which is transformed into a pedestrian zone, a “Learning Boulevard” that extends across the school grounds and on towards the adjoining Chimlibach neighbourhood. 

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

With the introduction of the new “learning landscape” and shared-use classrooms, more students can be taught. The free plan of the learning landscape enables different forms of use and learning concepts. It offers space for informal learning, learning aids, and group work as well as extracurricular uses or events. A new gymnasium is also being built.

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

The new extensions are constructed in wood. This ensures low weight loads, high prefabrication percentages and short construction times that minimise disruption of the ongoing school operations. The extensions give the existing school a stronger urban presence and create a spatially defined centre.

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

Team:

Architects: weberbrunner architekten

Landscape architecture: KuhnLandschaftsarchitekten GmbH

Building services engineering: energiehoch4 AG

Electrical engineering: WSM AG

Lighting design: d-lite lichtdesign

Civil engineering: Walt + Galmarini AG

Building physics and acoustics: zehnder & kälin ag

Colour concept: Nadja Hutter Cerrato

Photographs: Beat Bühler

photo_credit Beat Bühler
Beat Bühler
photo_credit Beat Bühler
Beat Bühler

Materials Used:

Facade cladding, new extension:                    

5mm aluminium panels, uncoated, sanded

Manufacturer: Spleiss AG

Flooring, stairs and halls:                        

Cement-bound floor slabs
Manufacturer: Botticino No. 1601

Contractor: Knobel AG

Flooring, learning landscape:                        

Wooden flooring, european ash

Contractor: Deluxe Parkett AG

Flooring, gymnasium:

Polymatch point-elastic sports floor
Manufacturer and contractor: Realsport

Interior Doors:                                     

Steel frames and wood panel doors

Contractor: Robert Fehr AG

Metal exterior doors:

Schüco system

Contractor: Wehrli Metallbau AG

Aluminum windows:              

Schüco AWS 90 Si

Contractor: Christen Metallbau AG

Flat roofing:                             

Sika Sarnafil PTFE waterproofing membrane, Substrate with extensive vegetation

Contractor: Burlet AG

Skylights:

Standing seam zinc sheet metal roofing, coated

Contractor: Burlet AG

Interior lighting, learning landscape:                        

Zumtobel Light Field LFE

Contractor: Elettrocrivelli SA

Interior furniture, learning landscape                   

Repurposed and refurbished furniture

Contractor: Möbel Zürich AG

Interior furniture, meandering coatroom in corridor:

Manufacturer and contractor: Robert Fehr AG           

photo_credit weberbrunner architekten
weberbrunner architekten
photo_credit weberbrunner architekten
weberbrunner architekten
photo_credit weberbrunner architekten
weberbrunner architekten

Project credits

Landscape Architects
Photographers
Civil Engineers
Building physics and acoustics

Product spec sheet

Metal exterior doors
Waterproofing membrane
Sarnafil® by Sika
Interior Lighting
Cement-bound floor slabs
European ash wooden flooring
Cement-bound floor slabs

Project data

Project Year
2020