Oficinas Rappi Argentina
Gonzalo Viramonte

Oficinas Rappi Argentina

Octava Arquitectura as Architects

The rehabilitation of an old stud, dating from the beginnig of the XX Century in the Palermo neighbourhood, Buenos Aires, has become a fluid workspace for the delivery company Rappi Argentina. Taking into account the patrimonial condition of the building, most elements where preserved and restored inside and outside: doors, metral structures, marbles, glass and vegetation.

 

The floor plan is structured in three naves, one central and one on each side. The main nave is a big workspace with a long acrylic vaul twhich delivers a great amount of natural light.

 

In this same space trees and plants cohabit combined with the strong presence of a white and green color palette which suggests the idea of light and nature. Lateral naves work as meeting rooms, small office spaces, dining area and restrooms. The materials of the project are green-dyed veneered wood, white terrazo with green and beige pebbles, black metal, black ash tree melamine, white ceramic, cementfloors, etc.

 

Material Used:

1. FV /  Griferias

2. Sadopan / Material muebles cocina

3. Vite / Porcelanatos

4. Huup / Luces colgantes

5. Lucciola / Luces colgantes

This story is available in multiple languages
Share or Add Oficinas Rappi Argentina to your Collections
Project Credits
Product Spec Sheet

Product Spec Sheet
New Changi Airport Terminal 4
next project

New Changi Airport Terminal 4

Airports and Passenger Terminals
Changi, Singapore - Build completed in 2017
View Project