Paris 2024
An overview of projects, products and exclusive articles about Paris 2024
News • News • 6 Aug 2024
DREAM completes hybrid timber office building with 3x3 basketball courts for Paris 2024 Athletes’ Village
French architectural studio DREAM completed a hybrid timber office building topped with 3x3 basketball courts as part of the Paris 2024 Athletes’ Village. The low-carbon building is providing office space during the Olympics and Paralympics. An adaptable design seeks to ensure use of the building beyond the period of the Games.
Cyrille Weiner
DREAM
The 54-hectare (133.4-acre) Paris 2024 Olympic and Paralympic Village was built across three communes of Seine-Saint-Denis in the northern suburbs of Paris: Saint-Denis, Saint-Ouen-sur-Seine, and L’Île-Saint-Denis. Architect Dominique Perrault was tasked with the design of Sector E — named “Les Belvédères” — for housing at... More
Project • By Mosa • Swimming Pools
Piscine Georges Vallerey
La piscine Georges Vallerey, designated as a training site for the Olympic and Paralympic athletes of the Paris 2024 Games, reopened in the spring after more than a year and a half of construction. Architects AIA Life Designer and Romain Viault proposed a targeted intervention on the technical elements necessary for the operation of the building and a complete rehabilitation of the open roof.
Hugo Hébrard
Hugo Hébrard
Mosa’s Core Collection Terra was used in several zones throughout the building.
Terra upholds the same standards as all Mosa surfaces, standing out for their reliability and long-lasting appearance. Our floor tiles have been engineered for demanding environments, featuring a hard, scratch-... More