Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

Siebold nijenhuis architect

An overview of projects, products and exclusive articles about siebold nijenhuis architect

Project • By Broekbakema • Universities

Arentheem College

Situated on the valuable and fragile south-west corner of Park Presikhaaf, the new campus complex for Arentheem College forms a unity with the green landscape. Three schools are connected by a second surface level whilst retaining their unique feel and identity. This is all achieved in a single building, although student flows do not meet. Urban development principles and the limited space available gave rise to the second surface level. Above this ‘plinth’ the theory landscapes are contained in separate volumes. Under this second surface level are all the practical areas and the so-called service strip, which accommodates all the utility functions such as parking, stockroom, waste processing and bicycle sheds. The second surface level i... More

Project • By Broekbakema • Offices

Robecotoren

Both the original interior of the company cafetaria, designed by Wim Quist in 1992, and the layout of the Robeco Tower no longer reflected the present corporate image, which is expressed in the new corporate style. Recent restructuring and the closing down of other branch offices have, however, resulted in a doubling of the number of employees who work at the head office. This meant that the seating had to be increased considerably. The new interior is to a large extent based on the new corporate style and its accompanying colour scheme. Company cafetaria The most important change to the cafetaria is the introduction of a long dining structure, finished in white Corian®, on an elevated floor. This structure divides the large but low s... More

Project • By Broekbakema • Factories

CP Organon

The first completed building on the former paddock of the pharmaceutical company Organon in Oss is the CP production building. The plant consists of three production lines on the first storey. These are connected by a service strip that contains the support functions, such as offices, toilets and changing rooms. Above the actual production floors is a technical storey with all the installations and technical facilities. The supply and transport of goods is located on the ground floor, while the main entrance is on the first storey. Broekbakema has been put in charge of the master plan for the paddock, fitting the CP within the boundary conditions of this master plan and forming the façades of the CP. The façade concept for the C... More