Archello Awards 2025: Open for Entries! Submit your best projects now.
Archello Awards 2025: Open for Entries!
Submit your best projects now.

FISHT OLYMPIC STADIUM

FISHT OLYMPIC STADIUM
Sochi 2014

SOCHI 2014 WINTER OLYMPIC GAMES

CHALLENGE


Russia’s bid for the 2014 Winter Olympics was part of a broader goal to step back onto the world stage as hosts of major sporting events (the country’s last event was the Moscow Summer Olympics back in 1980). The challenge was threefold: to convince the International Olympic Committee that Russia had both the vision and the infrastructure to host such a major event; to develop the popular summertime coastal resort of Sochi into a world class destination for winter sports, and to design a stadium flexible enough to facilitate the Olympic ceremonies, then act as a venue for FIFA World Cup matches and, finally, become the home venue for a local football team.


INNOVATION


For the first time, an Olympic Park has been designed as part of a Winter Games master plan. This unusual step guarantees a unique legacy for these Games, marking Sochi out as a winter destination for decades to come. Within the park, the main level of the stadium is raised on a landscaped mound, providing stunning views from within. The unique engineering systems will enable truly memorable opening and closing ceremonies while, post-Games, the in-built flexibility of the stadium’s design means its capacity can change over time to provide event configurations from 45,000 seats for FIFA World Cup matches to a compact, atmospheric 25,000 for local matches.


IMPACT


Winning the bid for the 2014 Winter Olympic Games has not only reinstated Russia’s reputation as a viable host for major events, but has transformed Sochi itself. The infrastructure that our work has helped create will regenerate the region, marking Sochi out as a year-round tourist destination and major new European winter sports center.

Project credits

Architecten
Column formwork

Product spec sheet

Column formwork
Fabrikant

Project data

Bouwjaar
2014
Categorie
Stadions
Verhalen door
Populous
Geoplast

FISHT OLYMPIC STADIUM SOCHI

Fisht Olympic Stadium was built for opening and closing ceremonies of Winter Olympic Games in Sochi, Russia, in 2014. The stadium hosts 40,000 visitors.


Our Geotub formwork was used to build round and oval columns.

Geotub provided:

- Easy and fast installation,

- Smooth surface for columns,

- Easy replacement and storage on the construction site,

- Mechanical resistance to concrete pressure up to 80 KN/m2,

- Reusability for more than 100 times,

- No machinery nor cranes needed.


Read more

Fisht Olympic Stadium, Sochi, Russia

Geoplast Formwork: simplicity and innovation

Geotub and Sochi Olympic Stadium

Geotub

Deel of voeg FISHT OLYMPIC STADIUM toe aan uw collecties