Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026
Bike track Huda Luknja
Damjan Bradač

The Huda Luknja Bike Track

 The new cycling track at Huda Luknja follows an old railway line. The original railway between Velenje and Gornja Radgona was part of the Levantine Railway, opened in 1891 during the time of the Austro-Hungarian Empire, and abandoned in 1968.

photo_credit Benjamin Hafner
Benjamin Hafner
photo_credit Damjan Bradač
Damjan Bradač

The route is approximately 24 km long and follows the alignment of the Mislinja Valley, which was shaped by the Paka River. It makes use of the former railway corridor, including several historic tunnels.

photo_credit damjan Damjan Bradač
damjan Damjan Bradač
photo_credit Damjan Bradač
Damjan Bradač
Caption

The design of the five new bridges follows the original concept of linear railway engineering. Steel beams span distances of up to 31 meters, creating exciting and dramatic views for cyclists while revealing the history of the former track once used by the mines of the Šaleška dolina region.

www.dba.si / https://dba.si/project.php?project=36 /

Caption

Project credits

Leading architect

Project data

Location
Huda luknja
Project Year
2024
Category
Bridges
Primary Building Material
Concrete
Steel
Share or Add Bike track Huda Luknja to your Collections