ALN built a new 3-storey reinforced concrete building clad with corten steel. A monolithic cubature was created on the narrow and difficult building ground with 70% slope inclination. Clear forms, use of recyclable and regional building materials, no composite materials and minimisation of energy consumption were the guiding principles of the building concept. The basic construction, including the flat saddle roof, consists of reinforced and fair-faced concrete. Ceilings and roof have a concrete core activation. Slope water from the mountain is used for heating and cooling.Simple, aesthetic and sustainable architecture: no subsequent surface treatment or maintenance means a long, resource-saving life cycle.
Material Used :
1. Cemex – concrete - ready-mixed concrete and special concrete “aaton® aqua”
2. Corten steel - façade Cladding – local producer
3. Schueco – Windows - Schueco AWS 75
4. FSB – door fittings - FSB 1005
5. Velux – Skylights - Velux Modular Skylights
6. Villeroy&Boch - sanitary furniture -
7. Bauder - roof sealing - BauderTEC, BauderTHERMOPLAN, BauderPIR
8. Kone – elevator - MonoSpace