Archello Awards · Winners Announced
Archello Awards 2024 · Winners Announced
Archello Awards 2024
Winners Announced
Economics and Business Faculty
FG+SG – Fernando Guerra, Sergio Guerra

Economics and Business Faculty, Diego Portales University

Duque Motta & AA as Architects

The project is the result of the competition for the revision of the new Huechuraba Campus master plan, and the definition of the project for its first phase, the Economics and Business Faculty of the Diego Portales University.


The site is located at the foot of San Cristobal hill, sloping and slightly raised above the Huechuraba valley. With the location of the new campus, the Faculty seeks to build a strong link between its academic development and the professional reality, as it is at one of the most important business centers in the city.


From the architectural point of view, this presented the challenge of asserting an academic identity in an environment governed by very different rules. Amid buildings that are mostly for office rental, glass boxes lacking a clear identity and designed with a short term logic, the project wanted to build a contrast, a structure with weight that speaks of permanence and stability, to accompany the university in its long-range commitment and transcendence. The density of the volumes, the concrete that lasts and ages, walls to be covered with vines showing the passing of the seasons, a park that matures in years and stone courtyards, combine to consolidate over time. In addition, the project seeks to build a connection beyond its neighbors, with its geographic environment. It takes advantage of the slope to render the courtyards dominant over the territory, and builds terraces at different heights, as well as a roof garden, that connects the everyday life of the project with the distant geography, San Cristobal hill, and Huechuraba valley. These are places that link leisure time with the surrounding landscape.


The proposed master plan combines four elements for the construction of the project, defining a section in the direction of the slope. The project of the faculty, as a first stage of the total, includes these four elements, advancing in its definition:

1. A basement formed by a linear succession of horizontal planes that builds the courtyards of intensive use, as balconies over the Huechuraba landscape, which houses the public programs of the university. In the first stage, the basement defines three different courtyards, the access square that connects the two main buildings of the faculty, the undergraduate square that connects to future phases, and the graduate square that is directly related to the park. Under these courtyards, the base houses a cafeteria, the school library and the main auditorium of the university.


2. A large, eight level continuous bar, with neutral architecture, acts as a backdrop against the hill and houses the system of regular classrooms, which require more modular flexibility. For the Business Faculty, this building houses undergraduate classrooms which are organized by an exterior corridor overlooking the courtyards of the project, and linked to a series of raised terraces that cross the building, serving as spatial relief at the higher levels.


3. On the base, and in front of the bar, the master plan proposes a series of unique buildings that dialogue with the neutrality of the bar, establishing a scenic figure-ground relationship. These unique buildings give a certain rhythm and frame the landscape view from the courtyards. They also contain the most iconic programs of each unit, and their diversity gives identity to each part of the campus. At this first stage it houses graduate classrooms and academic offices. The building develops through a spiral configuration, which links the inclined graduate rooms at half levels, and offices on its upper floors, which organize their circulation around a central light void. This building is elevated, leaving a large open space in its base that connects and articulates the higher program of the building with the courtyards, the park, and the territory.


4. Finally, a park is defined on the lower area of the site that is intertwined with the base. It builds a safe distance with the existing urban area, and offers an extensive sports program.


The project is part of a strong desire of the university to build environmentally sustainable infrastructure. The project is designed from the architecture, landscape, and technical facilities, in terms of savings in energy and water, minimizing its impact on the environment, and insuring high standards of comfort for its occupants. The building seeks to reduce solar impact on the shell: the exterior graduate walls are constructed with highly controlled openings, just enough for good lighting and views, and a central void for indirect light, around which the circulation is laid out. Furthermore, the building proposes a system of planters on the north and west facades, to grow deciduous vines that provide shade and humidity during the hot months, and a roof garden that acts as a buffer for thermal insulation. In the undergraduate building, the east facade is constructed from a concrete wall clad in decorated glass reflecting the hill and filtering light into the classrooms through controlled openings. To the west, a large vertical concrete lattice, with perennial vegetation planters, shading the corridor and classrooms. Finally, the building seeks to exploit the breeze from the west in the hot months, to generate cross ventilation in the classroom building and upward movement of air in the central void of the graduate building.


Read story in Español

Project Credits
Architects
Sustainability Consultant
Technical Inspection
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico
12 Dec 2024 News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico

Mexican architecture studio Fernanda Canales has designed a semi-open, circular community center for... More

Australia’s first solar-powered façade completed in Melbourne
12 Dec 2024 News
Australia’s first solar-powered façade completed in Melbourne

Located in Melbourne, 550 Spencer is the first building in Australia to generate its own electricity... More

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
11 Dec 2024 News
SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse

In the heart of Westminster, London, the London-based architectural studio SPPARC has restored and r... More

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
10 Dec 2024 News
Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals

Ryohei Tanaka of Japanese architectural firm G Architects Studio designed a bijou coffee stand in Ky... More

New building in Montreal by MU Architecture tells a tale of two facades
10 Dec 2024 News
New building in Montreal by MU Architecture tells a tale of two facades

In Montreal, Quebec, Le Petit Laurent is a newly constructed residential and commercial building tha... More

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 Dec 2024 News
RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin

Located on Georgetown University's downtown Capital Campus, the McCourt School of Policy by Robert A... More

MVRDV-designed clubhouse in shipping container supports refugees through the power of sport
9 Dec 2024 News
MVRDV-designed clubhouse in shipping container supports refugees through the power of sport

MVRDV has designed a modular and multi-functional sports club in a shipping container for Amsterdam-... More

Archello Awards 2025 expands with 'Unbuilt' awards categories
9 Dec 2024 Archello Awards
Archello Awards 2025 expands with 'Unbuilt' project awards categories

Archello is excited to introduce a new set of twelve 'Unbuilt' project awards for the Archello Award... More