EMPEREUR

EMPEREUR

Architect
architectesassoc. sprl
Location
Bruxelles, Belgium | View Map
Project Year
2015
Category
Offices

Housing
Stories By
architectesassoc. sprl

Metadecor
Renaud Callebaut

EMPEREUR

architectesassoc. sprl as Architects

Work here concentrates on the impact of built and un-built volumes on the existing urban landscape, leading to the first obvious option not to occupy the entire terrain (as does the existing 1950s office block promised to demolition) but instead step back, re-aligning with the back-side of the left-hand neighbor. Secondly, option is taken to develop a bona fide 3-facade end-piece, finishing off an existing alignment of imposing boulevard architecture punctuated by the restored Tour Anneessens. This is therefore a strategic site articulating 19th-century-scale buildings and medieval-scale vestiges, no gestures wanted, only pertinent responses.


A neutral white ensemble serving as " fond-de-scène " for the medieval Tour is imagined, characterized by a rhythmic un-identical series of steps back, on all three sides, molding and qualifying as such the open space crystallizing between the new building and the Tour. Built and un-built space folds and un-folds, deforms then reforms, morphs, taking its cue from immediate context as well as from the ergonomics of the resulting interiors and terraces. The outcome brings added value to the small planted garden next to the project on which the Tour once forlornly stood, with fresh and inviting perspectives to and from the vestiges, and secure and convivial public/semi-public space where tourists and passers-by can stop and admire them. A winding concrete serpentine serves as a welcoming bench, winding its way right up to the last fragment of medieval arch upheld.

EMPEREUR BUILDING

Metadecor as Engineering and assembling

Old and new come together at Empereur

We were commissioned to finish a nine-story residential and office building in the center of Brussels using MD Expanded metal. This included auxiliary construction and finished edging around the windows.


The existing building is anchored with the historic Anneessen tower, one of the few protected remains of the medieval city wall of Brussels, the foundations of which were more than six meters above the excavations of the underground level.


Share or Add EMPEREUR to your Collections
Project Credits
Engineering and assembling
Contractors
Engineers
Products used in this project
Product Spec Sheet

ElementBrandProduct link
Engineering and assemblingMetadecorMD Expanded metal
Product Spec Sheet
Engineering and assembling
Nobel House
next project

Nobel House

Private Houses
46210 Picanya, Valencia, Spain - Build completed in 2019
View Project