Specifier · Let manufacturers think along with the materialization of your project
Gerhard Swarovski Rosentury

Gerhard Swarovski Rosentury

Location
Brixlegg, Austria | View Map
Project Year
2010
Category
Offices

Gerhard Swarovski Rosentury; Thermal reurbishment

HELIOPAN Energie Fassaden GmbH as General Contractor

“Thermal refurbishment” doesn’t sound spectacular. But the example of the ‘Gerhard Swarovski building’ in Brixlegg shows, that it can be an exciting challenge. It has a completely new architectural appearance. And the economical key data are amazing – due to the active Heliopan High Energy façade up to 75 % energy costs can be saved and a pay back period of 8 years achieved. Technical highlights • 200 m² Heliopan High Energy Panels (solar thermal energy is supporting the heating system) • Replacement of about 1600 m² glass façade: double glazing is changed to triple glazing (U-value = 0.6 W/m²K) • Replacement of the conventional oil heating system to a high efficient water heat pump with depth drilling

Project Credits
Product Spec Sheet

Pillar house
next project

Pillar house

Apartments
Bangkok, Thailand - Build completed in 2020
View Project