Karantina park rehabilitation

Karantina park rehabilitation

Catalytic Action as Architects

The rehabilitation of Karantina Public Park is a project implemented in response to the devastating Beirut Port Blast. Karantina was one of the neighbourhoods most impacted by the blast. One of the spaces devastated by the blast was the Karantina Park, a public space we designed the play items for back in 2016. This project sought to rehabilitate the park and create a safe space for children to play and call their own.

Caption

We started with a series of participatory design activities that aimed at understanding what the community wanted from their public park. We conducted these activities with children, adolescents and their caregivers. Children expressed their ideas for the park through drawing, storytelling, and acting as young architects. Their ideas for the park reflected their desire for a colourful space and play items that could be used collectively. Design consultations with caregivers alluded to the need for a space that could be easily maintained, as well as somewhere that they felt was safe for their children to play in. Caregivers also suggested that there could be a quiet space within the park which children could use for learning.

Caption

Building on children’s ideas for collective play, we implemented play items which could be used safely by lots of children at once. For instance, we designed and implemented a giant slide and a snake swing for multiple users, as well as tree stumps for jumping, a climbing wall and pull up bars. We also incorporated play items such as music rollers and wooden windows that were suitable for toddlers. For adolescents, we designed a TikTok stand on top of the bridge that they can use to shoot their videos. Our design for the park also incorporated new benches, water points, a toilet sign and access paths. In addition to the new items we added, the design involved fixing aspects of the park which had been damaged during the blast. This included rehabilitating existing tables and benches, paint works, play items and the park’s decking and handrail.

Caption

As part of the rehabilitation we also designed and implemented an indoor space called ‘Makani’ – my place – which transformed an unused room into a multipurpose child friendly space. The design created a safe environment that could be used to conduct a wide range of educational and recreational activities.

Caption

The construction was led by a team of local workers, including both Syrian and Lebanese labourers from Karantina. The materials used for the construction of the park were also sourced locally, not only enhancing the local economy but also ensuring that the park could be easily repaired. Children also took part in the construction phase by creating a mosaic on top of one of the benches, painting and leaving their permanent mark on the space.

Caption

We are continuing to activate the park by working with the community through our Kan Ya Makan program. We believe that children have a right to feel safe, to play and to have a voice in the recovery of Beirut.

Caption
Project Spotlight
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More