Mistley Manor luxury care home

Mistley Manor luxury care home

Location
Mistley, United Kingdom
Project Year
2014
Category
Care Homes

Stour Valley Care Group specifies six powered assisted baths from Gainsborough Specialist Bathing at Mistley Manor care home

Gainsborough Specialist Bathing as Manufacturers

Three Ascot hi-lo baths and three Windsor baths with powered seat have been installed at the new sixty-six bed care home in Manningtree, Essex. Completed in December 2014, Mistley Manor represents the new flagship care home development for the Stour Valley Care Group.


Nearly £7 million has been invested into this new build project to ensure the very highest standards of care provision can be delivered. A 150-strong care team will support over sixty residents, including some individuals with conditions like Dementia and Alzheimer’s. In addition to the main building complex which accommodates sixty residents over three floors, four separate bungalows have been built to provide independent living accommodation for selected residents.


Construction of Mistley Manor began in 2012 and owners, Mike and Jacqui Volf, were responsible for not only the project management but also the specification, design and co-ordination of the construction for this new development. Above all, Mike and Jacqui were keen to create a place of complete luxury and comfort for their residents, and so they set about designing a ‘care hotel’. Essentially, it is a residential care environment with a stylish more sumptuous, aspirational feel compared to a conventional care home setting.


After intensive research of several specialist bathing manufacturers, Gainsborough was identified as the perfect bathing partner for this innovative new-build project. Crucially important was the need to minimise moving and handling risks. It was essential Jacqui Volf selected the most suitable products to match the needs of both the residents and the on-site care team. Gainsborough’s wide range of specialist baths ensured Jacqui was able to tailor her choice to create a safe, comfortable and pleasant bathing experience for Mistley Manor’s residents. Following a thorough consultation process, Gainsborough was selected to assess, survey, design and install six assisted bathing systems within the main building complex and four adjacent bungalows.


Products specified Two alternative bath models from Gainsborough’s product range were selected by the Stour Valley Care Group as the care needs of residents varied between the main building and the adjacent independent living bungalows.


Within the main building complex, the Ascot hi-lo baths provided a compact bathing solution, maximising bathroom space and allowing sufficient access for carers. The powered transfer seat and variable-height adjustment on the Ascot bath eliminates the need for carers to manually lift residents in and out of the bath. This ensures moving and handling risks for carers, including potential back and muscle strain, are fully minimised. Designed to be easy-to-clean, the Ascot bath helps care staff maintain enhanced levels of hygiene, particularly within high traffic wet areas in care homes. The Ascot bath combines TMV3 water temperature controls, integrated shower unit and a soft-touch seat with removable hygiene aperture to allow residents to bathe safely and in complete comfort.


With residents in the on-site bungalows being more independent, the Windsor bath was considered a more appropriate solution given the specific needs of those bathers. Designed to fit into the space of a traditional style bath, the fixed-height Windsor incorporates a powered transfer seat that can be operated simply with an easy-to-use, roaming handset.


The powered seat traverse function lifts, rotates and lowers the bather safely and efficiently into the bath without the need for manual assistance.


Project management Gainsborough product specialists completed comprehensive site surveys as construction of Mistley Manor began. Detailed 3D layout drawings illustrated the optimum position of the baths to maximise accessibility in and around the bathrooms in the main building. Each Ascot bath was centrally located to allow greater access to the bather. This also ensured wheelchairs and other patient transfer equipment had sufficient space available to allow residents to be manoeuvred safely and efficiently.


Once Gainsborough’s technical recommendations were provided, electrical, water and waste connections could then be made ready for the delivery and installation of the baths by Gainsborough’s experienced fitters. Kevin Williams, Gainsborough’s Regional Sales Manager, oversaw the complete process to ensure the installation was implemented smoothly, on-time and within budget.


Kevin then carried out a comprehensive training programme for the care staff. This focused on the safe operation of the baths while offering the latest guidance on handling of bathers within a care environment.


"We were looking for versatile, easy-to-use bathing solutions that would offer the highest levels of care and flexibility for our residents. The Gainsborough product specialists were helpful and talked us through the various options and main considerations to bear in mind. Their professional approach and ability to support us right from the concept and design stages through to commissioning and carer training were absolutely critical to our final decision.


We designed Mistley Manor to offer a luxurious, yet exceptionally comfortable living environment for our residents. Every element of the build was carefully considered, from the spread and variety of accommodation available to the design and specification of the various fixtures and fittings throughout. Gainsborough’s specialist baths create an enjoyable bathing experience for users and help our team deliver greater levels of care. The Gainsborough power-adjustable baths also assist us in maintaining high levels of infection control.


Not only do the baths reduce manual handling risks for carers, the Windsor bath delivers greater independence for residents in our bungalows which is critically important for their long term well-being. We are delighted that our bungalows allow elderly couples to continue living together happily in a safe and comfortable environment. Kevin, Gainsborough’s Regional Sales Manager, has been very supportive throughout the installation and commissioning process. His dedication and continued support has ensured all our specific needs have been met.'


Jacqui Volf, Mistley Manor, Owner.


Project Credits
Product Spec Sheet

ElementBrand
ManufacturersGainsborough Specialist Bathing
Product Spec Sheet
Featured Projects
Latest Products
News
Poppodium Nieuwe Nor offers a new landmark and hub for new music in the Netherlands
29 Jun 2022 News
Poppodium Nieuwe Nor offers a new landmark and hub for new music in the Netherlands

  In the city center Of Heerlen, Poppodium Nieuwe Nor by diederendirrix is a unique new landma... More

Izar Houses in Mexico celebrate the natural landscape, light, and rainfall
29 Jun 2022 News
Izar Houses in Mexico celebrate the natural landscape, light, and rainfall

On a steep site in Mexico, Izar Houses by Taller ADG Alonso de Garay pay exceptional attention to en... More

25 best architecture firms in Madrid
27 Jun 2022 News
25 best architecture firms in Madrid

Madrid is a center of gravity for European architecture. Spain’s capital city is host to an am... More

Lviv’s Radio Garage offers an experimental space for temporary exhibitions with a focus on radio, sound art, VR-art, and interactive media
25 Jun 2022 News
Lviv’s Radio Garage offers an experimental space for temporary exhibitions with a focus on radio, sound art, VR-art, and interactive media

In Lviv, Radio Garage is a media art centre and an experimental gallery for temporary exhibitions wi... More

Urban infill project Manifesto Market Andel activates an underutilized gap in Prague’s urban fabric
25 Jun 2022 News
Urban infill project Manifesto Market Andel activates an underutilized gap in Prague’s urban fabric

Located in Prague’s Andel District, Manifesto Market Andel is an urban infill project activati... More

Amsterdam’s iconic Droogbak building transformed into a 21st-century office space for a prestigious law firm
24 Jun 2022 News
Amsterdam’s iconic Droogbak building transformed into a 21st-century office space for a prestigious law firm

An iconic 19th-century building next to Amsterdam Central Station, Droogbak has been transformed int... More

Renovated hacienda-style villa in Belgium respects its history while exploring form and materials
24 Jun 2022 News
Renovated hacienda-style villa in Belgium respects its history while exploring form and materials

House VD-B by Graux & Baeyens architecten is a renovated hacienda-style villa in Evergem, Belgiu... More

Landmark urban renewal project comes to the heart of Bruges with the completion of The Bruges Meeting & Convention Centre (BMCC)
22 Jun 2022 News
Landmark urban renewal project comes to the heart of Bruges with the completion of The Bruges Meeting & Convention Centre (BMCC)

In the heart of the historic city of Bruges, The Bruges Meeting & Convention Centre (BMCC) is a... More