A multi-purpose hall in the municipality of Bubendorf. The polygonal form blends into the heterogeneous surroundings and, together with the striking school building, forms its new town center. Typologically, the new building is based on festival halls and tent constructions. It is a pure wooden construction, which wears a metal dress for protection. This dress made in standing seam technique also emphasizes the texile appearance, since it changes depending on the incidence of light. Inside the foyer and the hall are lined with wooden slats of different widths. The adjoining rooms are cladded up to 2.30m. Above this line you can experience the raw wooden construction.
Material Used:
1. Prefabricated wooden framework and rafter roof – construction
2. Patinated titanium zinc standing seam – facade and roof cladding
3. Green inked and raw sealed hard concrete with PU friesze – flooring
4. Area-elastic floor for sports- and multipurpose usage – flooring
5. Painted wooden boards and panels with acoustic gaps – walls
6. Raw wooden window embrasures
7. Green glazed stoneware tiles – flooring and walls
8. Acoustic curtains – walls
9. Raw OSB-board – walls and ceiling
10. Spakeled fermacell- and rigipsboards – walls up to 2.30m
11. Raw narrow wooden beams and boards – acoustic ceiling