Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

Multi-purpose hall in Châteaufort

Multi-purpose hall in Châteaufort
Michel Denance

Multi-purpose hall in Châteaufort

In the former service quarters of the château of the Domaine d'Ors, in the heartof a vast natural reserve, the architect Leo Berellini has completed theconstruction of a new multi-purpose hall for the town of Châteaufort.

The new multi-purpose hall is associated with an important heritage site including a mill, achapel, an orangery, and other edifices positioned around the park. Situated just outside thetown, the site extends over an area of 5 hectares, in the middle of nature, next to theprotected natural reserve of the Merantaise Valley.

The service quarters of the château are comprised of three buildings arranged in a “U” shapearound a 600m² grand courtyard, oriented south. A protected wooded area surrounds thesite. The new extension stands to the north, in a clearing behind the building.

photo_credit Michel Denance
Michel Denance
photo_credit Michel Denance
Michel Denance

The project aim is discretion. It blends perfectly into the green surroundings. It exists inharmony alongside the service quarters of the château, which have their own charms. Thenew hall nestles into the slope of the terrain, discreetly covered by a green roof in continuitywith the clearing. It is positioned on the axis of the building, respecting its symmetry.

The longitudinal walls are designed and built with rammed earth, as if the side of the hill hadbeen cut away, exposing its entrails, and thereby the stratigraphy of its geological layers aswell. What material could have better integrated into the site than its own soil, worked intostrata, without altering its texture or colour?

photo_credit Michel Denance
Michel Denance
photo_credit Michel Denance
Michel Denance

The supporting rammed earth walls are lined on the inside with a 20cm-thick layer of pouredhempcrete, left exposed and affixed to the rammed earth walls with wooden studsembedded in the thickness of this lining.

During the design phase, all the architectural elements were carefully evaluated in order topush their thermal characteristics to their maximum capacities.

photo_credit Michel Denance
Michel Denance
photo_credit Michel Denance
Michel Denance

Team:

Client: City of Châteaufort

Lead architect: Leo Berellini architecte

Associate architects: Antonio Belvedere architecte (competition phase)

Roger Elbaz architecte (construction management )

Structural engineering: DVVD

Electrical engineering: SYLETIS

Fluids Engineering: Gilles Vanesson

Acoustics engineering: AGP

Photographer: Michel Denance

photo_credit Michel Denance
Michel Denance
photo_credit Michel Denance
Michel Denance
Caption
Caption

Project credits

Interior Architects
Photographers
Structural Engineers

Project data

Project Year
2025
Category
City Halls
Share or Add Multi-purpose hall in Châteaufort to your Collections