Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

Phase II

Applied products
View all applied products

West Architecture’s first project was a suspended mezzanine in a living space, located in a former Methodist Church in Islington.  In 2014 the practice was approached by its new owner to reinterpret the original project, namely refurbishing the main space and extending the roof to provide additional accommodation. The scheme responds to the clients’ specific patterns of living and brief alongside some sensitive planning constraints associated with the existing building.

photo_credit Ben Blossom
Ben Blossom

Works include a new room inserted into previously unused roof space, accessed via a stair enclosure from the main space below. This room is constructed as a stressed skin plywood box echoing the construction and structural rational of the original mezzanine. Internally all walls, floors, doors and architraves are formed from birch and spruce faced plywood. Our ambition was to elevate the end result above its starting point as a simple dormer extension.

photo_credit Ben Blossom
Ben Blossom

The entire apartment has also been upgraded including a new kitchen and bathroom with the original resin floor re-poured. The mezzanine itself, and its relationship to the main space remain unchanged by the works.

 

Material Used:
1. Facade cladding: Anthra-Zinc, VMZINC
2. Flooring: Birch faced plywood with Osmo Oil
3. Window Shutter: Spruce faced Multiply by TinTab
4. Interior lighting: Nomad by Rubn. Beam by E15
5. Bathroom and Kitchen fittings: Vola - Brass

Share or Add Phase II to your Collections