Remodelling Of The Can Saurina Building
Simón García

Remodelling Of The Can Saurina Building In Montornés Del Vallés

CPVA (Codina Prat Valls I Arquitectes Associates) as Architects

The building of "Can Saurina" is located in calle Mayor nº 2, in the center of town, in a square that is on the corner between Calle Mayor and Avenida Onze de Septiembre. It is a building formed by three different phases of ground floor and floor dating from 1922, in which, over the years, two different extensions have been made. Of the first extension is unknown in the year of construction, while the second extension was built in 1986.  The project integrates the three phases in a single block improving its accessibility and adjusting to current regulations and improving the interior distribution to create an exhibition hall, a meeting room, offices for cultural entities and a bar area.

photo_credit Simón García
Simón García
photo_credit Simón García
Simón García

The new program is organized following the existing construction model but creating a new access and a core of stairs to the outside and an elevator inside to make the routes accessible.  On the ground floor, the existing internal staircase and communication with the adjoining room are eliminated. On one side of the corridor is the elevator the block of adapted services, while on the other side of the corridor are distributed 3 offices for cultural associations of the municipality.

photo_credit Simón García
Simón García
photo_credit Simón García
Simón García

At the end of the corridor, access to the bar and the adjoining room is enabled. From the main access, an accessible ramp leads to the exhibition hall. This access can also be done by the elevator which works with 4 double boarding stops. A suitable place is also sought to locate the Terminus Augustalis, an identifying monolith of the Roman Via Augusta.

photo_credit Simón García
Simón García
photo_credit Simón García
Simón García

On the first floor we find an assembly hall and the ground floor of the functional radio program. Communication between the different floors and levels can be done both by stairs and by elevator.  On the lower deck a new floor is enabled that functions as a radio loft.

 

Material Used:
1. Facade cladding: prefabricados de hormigón, Arumí 
Hormigón polímero, Ulma 
2. Roofing: Cubierta de madera, Cobertes RESER SL, Thermochip
3. Accustic: Acústica integral 

Read story in ItalianoPortuguêsEspañolFrançais and Deutsch

Featured Projects
Latest Products
News
Vudafieri-Saverino craft Austrian-Alps inspired interiors for Snohetta-designed five-star hotel
25 Mar 2023 News
Vudafieri-Saverino craft Austrian-Alps inspired interiors for Snohetta-designed five-star hotel

Nestled amongst forests and peaks of a protected area of the Montafon valley in Austria, Falkenstein... More

Atelier Write designs an improvisational studio space in Tokyo for New-York based brand OVERCOAT
25 Mar 2023 News
Atelier Write designs an improvisational studio space in Tokyo for New-York based brand OVERCOAT

New York-based fashion brand OVERCOAT recently opened its first directly managed store designed by a... More

Door MVRDV ontworpen NIO House in Rotterdam geopend
24 Mar 2023 News
MVRDV-designed NIO House in Rotterdam opened

A multifunctional showroom for electric car brand NIO opened in Rotterdam on Thursday. The Chinese c... More

10 quaint wall coverings that can add personality to your bedroom
24 Mar 2023 Specification
10 quaint wall coverings that can add personality to your bedroom

The bedroom is a sacred space, a place where one can retreat from the world and unwind after a long... More

Prague’s Vltavska underground transformed into a vibrant public space for freestyle activities
24 Mar 2023 News
Prague’s Vltavska underground transformed into a vibrant public space for freestyle activities

Once a transport intersection avoided by citizens of Prague, U/U studio has replaced vacancy and dar... More

Rocky Hill Memorial Museum by Crone finds meaning through form and materiality
23 Mar 2023 News
Rocky Hill Memorial Museum by Crone finds meaning through form and materiality

Completed in 1925 as a tribute to the men and women of Goulburn, Australia, who served during World... More

Moody and seductive Sushi Zen by LDH Design opens in Beijing
22 Mar 2023 News
Moody and seductive Sushi Zen by LDH Design opens in Beijing

At No. 33 Wusi Street in Beijing’s Dongcheng District, LDH Design has recently completed works... More

KMR rethinks wooden residential construction with metal sheet façade and plywood louvres in Japan
22 Mar 2023 News
KMR rethinks wooden residential construction with metal sheet façade and plywood louvres in Japan

Surrounded by rice paddy fields and rural scenery with farmhouses dispersed throughout the countrysi... More