Ringsted Upper Secondairy

Ringsted Upper Secondairy

Secondary Schools
Ringsted, Denmark - Build completed in 2009

Ringsted Upper Secondairy

Henning Larsen as Architects

The large common spaces of Ringsted Upper Secondary School overlook the green square that connects the school with EUC (vocational education centre) and VUC (adults’ education centre). On the large, green space, campus life will take its beginning and provide for an interaction between students from the different institutions. The first stage of the school is placed as a two-storey high building along the road, Næstvedvej, to shield the campus area against the road traffic. Against Næstvedvej, a hilly landscape will be laid out by using excavation residues from the building site. The hills will be sown with grass and a forest of willow trees will be planted. The school will be accessed from the campus square towards the west through the central common space that will link together study areas, teaching sections and teachers’ facilities. Circulation between the ground and first floors will take place in the double-high multi-room that will function as a gathering point, cafeteria and study area. The first stage of the school will consist of two parallel classes at all levels and will house a total of 180 students and 16 teachers. With its mixture of open and more isolated rooms for group work, the building is designed to meet state-of-the-art ideas regarding student-activating teaching. When stage two is completed, the school will consist of five parallel classes at all levels. The first stage of the school is placed as a two-storey high building along the road, Næstvedvej, to shield the campus area against the road traffic. Against Næstvedvej, a hilly landscape will be laid out by using excavation residues from the building site. The hills will be sown with grass and a forest of willow trees will be planted.

The Whitney Museum of American Art at Gansevoort
next project

The Whitney Museum of American Art at Gansevoort

Museums
Gansevoort, United States - Build completed in 2015
View Project
Archello

Want to see more like this?

Subscribe to Archello's newsletter