Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

#industrialbuilding

An overview of projects, products and exclusive articles about #industrialbuilding

Project • By Fisocad BVFactories

Modular garage and workshop

A flexible steel building designed for fast assembly. This modular garage and workshop was engineered as a fully bolted steel structure, providing a durable, flexible and cost-effective solution for industrial and commercial applications. The project demonstrates how modern steel construction can significantly reduce installation time while maintaining high structural performance. The building is manufactured from formed steel profiles and assembled entirely with bolted connections, eliminating the need for on-site welding. This approach simplifies transportation, accelerates installation and allows the structure to be easily expanded, relocated or modified in the future. Fisocad BV Fisocad BV Fisocad BV The structural sys... More

Project • By Satya ArchitectsFactories

Dhoot Transmission – Industrial Facility

The Dhoot Transmission - Industrial Facility is conceived as a next-generation manufacturing campus that integrates operational efficiency with human-centric design.   Commissioned for Dhoot Transmission’s expanding manufacturing operations, the project was envisioned as more than a standard industrial shed. A high-capacity production environment supported by administrative offices, workers amenities, training infrastructure, and service utilities within one campus.   JAI SHARMA Located within an industrial setting, the site demanded a planning approach capable of balancing heavy-duty logistical movement with secure access, worker circulation, and long-term operational growth. The principal challenge was to organize... More

Project • By IPA - Architecture and moreDistribution Centres

Fresh&Frozen Logistics and Warehouse

Fresh & Frozen, a leading company in Bulgaria specializing in temperature-controlled grocery warehousing and distribution, collaborated with IPA – architecture and more to design one of the largest temperature-controlled warehouses in the country.  The new logistics base covers an area of 9,500 sqm. The main building features a one-story volume for storage covering an area of 6500 sqm, along with a two-story administrative area spanning 3000 sqm. During the design phase of the logistic base, all necessary installations and materials have been invested in the operational mode. Dian Stanchev Dian Stanchev The building’s modern and minimalist design sets it apart from typical warehouse structure, with color pla... More

Project • By Reload ArchitectureHotels

B Factory

Former warehouse and example of industrial architecture of the early 1900s, this building impresses with its facade of particular architectural value and the dominant position on the private courtyard in front.The restoration project set itself the goal of preserving the soul of the place and the building itself as much as possible and instead enhanced the inevitable break with the past given the contemporary use of the new spaces. It has in fact been converted for hospitality, residential and office use. Davide Galli A container of functions that creates a new place for aggregation, movement and work. An important step in the wider process of urban regeneration of the entire neighborhood.Reload has adopted a holistic approach in defi... More

Project • By ALAS Alarcon Linde ArchitectsOffices

MODULAR FACTORY

Berlin-based office ALAS designed the new headquarters of the paint manufacturing and technology-development company Hemmelrath Technologies in Erlenbach am Main, Germany. The building is part of the MoFa Building Project, which stands for Modular Factory and consists of a turn-key product for customers who are interested in a sustainable and integral solution comprising both the technology and the building around it.  Ronald Patrick During a conception phase over the past five years, both ALAS and HTC designed a plan to merge the machinery and processes with the building enveloping them. This has made it possible to explore the synergies of a holistic solution and provide a “tailor-made suit” for the already extremel... More

Project • By IPA - Architecture and moreOffices

SEG Work & Logistic Hub

SEG Work & Logistic Hub is one of the most innovative and distinctive projects for industrial buildings in the region.  Todor Todorov As a result of its design vision and operational functionality, the building sets new trends in the field of industrial construction in Bulgaria. An elegant design, modern materials, and innovative architectural solutions virtually change the traditional concept of a logistic building. Todor Todorov Several functional areas support tenants' operations, including an administrative section, a logistics section, a furniture and decor workshop, and a showroom. This facility produces and preserves everything needed to hold a large-scale event: stage sets, furniture, decorations, installations,... More