Archello Awards 2025: Open for Entries! Submit your best projects now.
Archello Awards 2025: Open for Entries!
Submit your best projects now.

Boston Hotel - 3D Modeling and MEP Coordination

BIM During 100+ Year Old Heritage Hotel Remodeling

Effective BIM execution during the heritage hotel remodeling- 3D BIM modeling of architectural and MEP designs and coordination

 

About Project

When you set to redesign a 100+ years old heritage hotel, you know it's going be a challenging task. This remodeling project demanded accurate mapping of the existing building, creating of demolition plan and drawings and then redesigning of the new construction. Creating accurate As-build drawings required significant coordination between the cross-design models. The structure is a 5-story building with around 150 rooms into the new design. MEP coordination becomes a critical and important aspect of this project while remodeling any old structure.

 

BIM Services Provided:

BIM 3D Modeling 

- Architectural | Structural | MEPFS

MEP Coordination

- Clash Detection

Exterior Rendering | Interior Visualization

 

Tools Utilized

Revit

AutoCAD

Tekla

Navisworks

 

Project Brief

For the purpose of renovation of the existing design, at first we went ahead with the creating of As-build drawing of building. Existing design drawings and mapping of the building provided the insight to build them. Our BIM modeler recreated the error free demolition plan from the existing building plan. This 3D models contains customized Revit families/joinery items, crucial ducting system and HVAC installations. This project has gone through various design phases such as As-build model, demolition model, 3D modeling, MEP coordination and more.

 

Teilen oder Hinzufügen von Boston Hotel - 3D Modeling and MEP Coordination zu Ihren Sammlungen