stade marcel aubour

stade marcel aubour
Michel Denancé

Stade Marcel Aubour

The old stadium presented itself as a heterogeneous ensemble which had been built in different phases over time and which, for this reason, was completely indifferent to the morphology of the site.

 

Hence the need to study a solution that took into account the complex altimetry of the surrounding areas as well as the constraints associated with the presence of lighting masts and mobile phone equipment, including:

·         a strong descending slope along the Tamaris Lane from 16.70m at its highest point on the north-eastern corner (where the vehicle entrance had been established), to 13.70m at the junction with Avenue Pierre de Coubertin (at the right of public entrance), down to 8.90m on the western boundary of the land

·         the need to keep the lighting masts and ancillary mobile phone installations in their original position whilst at the same time keeping them in operation throughout the construction period

 

One element that seemed important was the role of the stadium from an urban perspective.

The old stadium presented itself as an introverted entity, however, despite the various additions made over time, it showed a certain unity from the outside due to the presence of the perimeter walls that enveloped it.      

 

It seemed important therefore to preserve this "enveloping" perimeter wall along the Tamaris Lane and to create, at the crossroads between the Tamaris Lane and Pierre de Coubertin Avenue, a clearly identifiable public entrance.

 

To this end, an "incision" is created in the perimeter wall in the extension of Avenue Pierre de Coubertin and allowing visual transparency towards the stadium's entrance forecourt with:

·         a small set back from the public space for the smooth running of ticket sales operations 

·         the treatment of the central volume of the ticket office as a "signal" for the entrance.

 

The perimeter wall along Tamaris Lane was made up of a heterogeneous complex that could not be preserved as existing. As a result, it has been replaced by a "dry" wall in gabions allowing transparency at the back of the stands.

 

Inside the enclosure, the idea of the project is to surround the north and east sides of the site by a continuous "porch". The "porch" unifies and "unites" the various functions it finds on its path and in particular:

·         to the north, the two volumes housing the mobile phone facilities, the caretaker’s room, the public toilets and the ticket office. The porch widens into two stands connected by a gangway above the entrance.

·         to the east, the volume of the changing rooms and the volume of the infirmary, the bar and the office of the local football team. The porch protects the exits of the changing rooms and widens for the protected parking and a large terrace with the clubhouse reserved for players.

 

Functioning

 

The project functions on the basis of a strict separation between traffic flows. Two distinct areas are identified:

·         an area to the North, parallel to Tamaris Lane, reserved for the public spectators

·         a “technical” area to the East reserved for the players and officials

 

The entrance for the public is through the "incision" in front of the Pierre of Coubertin Avenue, by a forecourt set back from the public space which extends inside the enclosure, opens out onto the playing field and separates the east and west stands.

Access to the stands and the volumes of public toilet facilities is through the circulation area on ground level along the enclosure.

 

A gangway, on the upper level above the main public entrance allows the link between the two stands. An escape stair is located at the western end of the stand.

 

The entrance of the officials’ and players’ vehicles is located on the northeastern corner. From the parking area players and referees can access the large terrace on the same level with the club-house and office and the changing rooms below down the "monumental" staircase.

 

The changing rooms, naturally lit, are protected from the sun by the overhanging terrace above.

 

In accordance with the urban planning regulations, the stands are covered by a 30° single-slope tiled roof. The same goes for the clubhouse with its over-sailing roof above the main volume hiding from view the technical plant.

Project credits

Ingegneri

Product spec sheet

PLEINFIELD

Project data

Anno Progetto
2020
Categoria
Stadi
Primary Building Material
Concrete
Building Area
8000 m2
Condividi o Aggiungi stade marcel aubour alle tue Collezioni