Althan Quartier Austria

Delugan Meissl Associated Architects as Architects

Franz-Josefs-Bahnhof, which is located on Julius-Tandler-Platz in Vienna’s 9th District, was opened in its current, familiar form in 1978 and, alongside its core function as a railway station, can look back over a richly varying history of use. Efforts that have been made in recent years to lend the location a contemporary character with the name “Althan Quartier” have included a number of urban design studies related to the question of how the existing buildings can be remodelled in line with a wide range of new requirements and best integrated into its urban context. In addition to gaining the acceptance of the neighbouring population, the decisive objectives of the development project included the permeability to pedestrians, the opening up to Julius-Tandler-Platz, the creation of the broadest possible mix of uses and the obligatory densification of a central urban zone. 


The concept developed by DMAA in cooperation with JWA as ARGE AQ1  meets these requirements by very precisely addressing the existing buildings. This strategy is principally demonstrated by the decision to strip the part of the complex designed by Karl Schwanzer that faces the square back to its powerfully sculptural load-bearing structure and to create additional open areas and a sense of spatial depth by removing the apparently hermetically-sealed mirror-glass façade. The arguments for retaining this existing built substance are not only ecological but also include the great spatial quality and flexibility of this modular structure, which is imbued with the spirit of modernism.

 
The generous opening up of the base creates the desired spatial relationship with Julius-Tandler-Platz and increases the attractiveness of the station concourse while establishing an inviting connection between the new urban terrace and the central courtyard via the station, which becomes the focal point of the neighbouring spaces with their largely public functions. This courtyard also contains the new pedestrian connections between Althanstraße and Nordbergstraße. The internal spaces receive additional daylight via two new atria, which can be carved with minimum disruption out of the existing building thanks to the clear structural logic of the prefabricated concrete slabs. The densification referred to above is achieved through the construction of two new stories, which are stepped back in line with the contours of the building volume and will therefore merge, almost unnoticed, into the physiognomy of the existing urban fabric.
The subtle approach to the specific characteristics and architectural quality of the existing building is particularly highlighted by the juxtaposition of the serial aesthetic of the industrial building and the atmospheric qualities of its contemporary new interpretation. The wide range of urban movement and meeting spaces, areas for local facilities, shops, services, offices and apartments will enable the Althan Quartier to do justice to its potential significance as an open neighbourhood centre that creates a strong sense of identity while also functioning as an inviting public transport hub. 

Read story in Deutsch

Products Behind Projects
Product Spotlight
News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico
12 Dec 2024 News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico

Mexican architecture studio Fernanda Canales has designed a semi-open, circular community center for... More

Australia’s first solar-powered façade completed in Melbourne
12 Dec 2024 News
Australia’s first solar-powered façade completed in Melbourne

Located in Melbourne, 550 Spencer is the first building in Australia to generate its own electricity... More

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
11 Dec 2024 News
SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse

In the heart of Westminster, London, the London-based architectural studio SPPARC has restored and r... More

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
10 Dec 2024 News
Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals

Ryohei Tanaka of Japanese architectural firm G Architects Studio designed a bijou coffee stand in Ky... More

New building in Montreal by MU Architecture tells a tale of two facades
10 Dec 2024 News
New building in Montreal by MU Architecture tells a tale of two facades

In Montreal, Quebec, Le Petit Laurent is a newly constructed residential and commercial building tha... More

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 Dec 2024 News
RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin

Located on Georgetown University's downtown Capital Campus, the McCourt School of Policy by Robert A... More

MVRDV-designed clubhouse in shipping container supports refugees through the power of sport
9 Dec 2024 News
MVRDV-designed clubhouse in shipping container supports refugees through the power of sport

MVRDV has designed a modular and multi-functional sports club in a shipping container for Amsterdam-... More

Archello Awards 2025 expands with 'Unbuilt' awards categories
9 Dec 2024 Archello Awards
Archello Awards 2025 expands with 'Unbuilt' project awards categories

Archello is excited to introduce a new set of twelve 'Unbuilt' project awards for the Archello Award... More