Ca la Tecla
Pol Viladoms

CA LA TECLA

Applied products
View all applied products

The existence of the building has been documented since 1572. Over the centuries, the property has been occupied by successive generations and different family units, undergoing numerous transformations and adaptations to meet the needs of each period. This occupation continued well into the 2000s, when the building entered a prolonged period of disuse.

The project therefore starts from a building characterised by considerable spatial and structural complexity, resulting from its evolution over time. It is a highly fragmented dwelling, in which different construction typologies and several phases of intervention coexist within the same structure.

Caption
Caption
Caption

The main strategy of the project consists of the partial removal of the existing building volume. This intervention makes it possible to introduce a private outdoor space, previously absent from the original layout of the dwelling, and becomes a key tool for reorganising the building’s spatial structure while addressing the functional requirements and objectives established by the clients. Beyond the incorporation of this new outdoor space, the removal of part of the building volume improves solar exposure, ventilation and natural lighting, while establishing a new relationship between the interior spaces and the outdoors.

The intervention is located at the corner formed by the two streets surrounding the building, with a south-west orientation that favours solar gain throughout the day. Its strategic position creates a new void within the built mass, transforming the relationship between the dwelling and its surroundings and becoming the starting point for the project’s new spatial organisation.

Caption
Caption

This strategy results in a less compact building volume and reduces the depth of the dwelling’s floor plan. This allows natural light to penetrate further into the interior, ensuring that light from the new courtyard reaches the centre of the house, improving living conditions and the overall quality of the interior spaces.

Access to the dwelling takes place precisely through this new courtyard, which becomes a fundamental element in the project’s spatial organisation. Beyond its function as an outdoor space, the courtyard is conceived as a transitional space between the public and private realms: a space designed to provide intimacy, shelter and a sense of domestic appropriation. It thus becomes a habitable threshold that mediates the relationship with the street, guides access to the dwelling and establishes a gradual transition between the shared exterior and the private interior.

Caption

The ground floor, located at street level, primarily accommodates the daytime living areas, including the living room and the kitchen-dining area. These two spaces are interconnected through the existing openings in the rammed-earth walls, thereby preserving the permeability of the original structure and highlighting the building’s existing elements. At the same time, both spaces open directly onto the new internal courtyard through new openings in the courtyard-facing façades, establishing a direct visual and spatial connection with this outdoor area and allowing natural light to penetrate further into the dwelling.

In contrast to the more domestic and social spaces, the eastern side of the ground floor accommodates service areas and technical facilities, including the plant room, garage and bathroom. This arrangement allows the programme to be organised efficiently while freeing up the remaining floor area, promoting greater continuity between everyday living spaces and strengthening their connection with the courtyard.

Caption

The first floor is primarily dedicated to the sleeping area and accommodates three double bedrooms, as well as a large, multifunctional study space. The latter is conceived as a flexible area, capable of adapting and transforming over time according to the occupants’ changing needs. Its open configuration allows for different uses and potential future developments, envisaging it as a space for growth that brings versatility to the dwelling’s programme. Furthermore, this area is directly connected to the ground floor through a double-height space, reinforcing the visual connection between the two levels and creating a greater sense of spaciousness and vertical continuity.

Another key strategy of the project has been the relocation of the existing staircase, which has been repositioned at the centre of the dwelling. This intervention makes it possible to reorganise internal circulation, improve the efficiency of the connection between the two floors and free up the façade areas from vertical circulation elements. This, in turn, provides greater freedom to intervene in the wall surfaces and introduce large openings connecting the interior spaces with the new courtyard. The staircase therefore ceases to condition the relationship with the façades and instead becomes a central element in the organisation of the dwelling, while the perimeter spaces gain prominence through their relationship with natural light and the outdoors.

Caption
Caption

The material palette of the dwelling is primarily based on the recovery and enhancement of the original materials, stripping them of the layers of finishes added over time. This intention to preserve the building’s construction heritage is combined with the pursuit of compositional and chromatic balance throughout the project.

To this end, great care has been taken in selecting which elements are left exposed, aiming to express the character of the original materials honestly while keeping their presence restrained to avoid an excessive diversity of textures and finishes.

This strategy is balanced by a more contemporary architectural language, based on continuous, neutral surfaces such as microcement, timber parquet flooring and large, smooth, monochromatic vertical surfaces.

Caption
Caption
Caption
Caption

Project credits

Architects

Product spec sheet

Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers

Project data

Project Year
2026
Primary Building Material
Brick
Wood
Building Area
240 m2
Share or Add Ca la Tecla to your Collections