Congo Kintele Congress Centre
Emre Dorter

Congo Kintele Congress Centre

AVCI Architects as Architects

The Congo Kintele Congress Centre and Resort Hotel (KCC) which has shortlisted in WAF Awards 2018, is designed by London & Istanbul based Avcı Architects in a newly developing area of Brazzaville to host summits of the African Union and in a completeharmony with the geographical, climatic and cultural context it is located in to satisfy the sustainability criteria which Avcı Architects takes as the most important starting point in all of its projects.

 

The Congo Kintele Congress Centre and Resort Hotel (KCC) is in a newly developing area of Brazzaville, to the north of the new Olympic Centre. The site has panaromic views of the Congo River to the south and a forested unbuilt landscape to the north. The topography of the site is a valley carved out by the great Congo River which creates an island M’Bamaou in the foreground and the buildings sit parallel to the contours of this valley falling towards the river.

 

The positioning of the Congo Kintele Congress Center’s buildings on the site is largely dictated by this topography where we were concerned to minimise excessive excavation and shifting of earth away from the site. The larger objects of theprogramme: the 1500 seat Congress Hall, the 300 person Presidential Hall, the 1000 seat Banquet Hall and the 1000 person Public Piazza were placed in a line sequence interrupted by courtyards, and all reached by a public sheltered collonade that links these elements. The Hotel on the other hand is positioned 5 meters above this general public promenade, largely to give it better views to the river, while making a public / private segragation of functions on the site. All but two courtyards linking the enclosed volumes are accessible to the public, and allow us to form landscaped intermissions amongst the large masses of these functions. Thus theform of the Congo Kintele Congress Center settles in to the landscape, avoiding theappearance of an out of scale overbearing large mass of buildings while providing views of the Congo River from all hotel rooms.

 

The 350 meter long collonade also acts as a linear public space in itself sheltering people from the ever present rain that prevails most of the year around in this part of the world. The two ends of the Collonade also act as public gates to the whole complex. Attached to this public collonade are the Press Hall to the Western gate and Museum to the Eastern gate. At this end the Museum forms the southern edge of the Piazza, while the shops and the Public Restaurant form the Northern and Eastern edges of the Piazza. This open space is also sheltered from the rain with asquare occulus that allows the rain to fall in to a shallow pool at its centre.

 

Relationship with Climate… In the Congo Kintele Congress Center’s location for at least 6 months of the year rain is an everpresent climate phenomenon in Congo and defines the way people interact in public and with public space. Therefore great effort was made in this sense to shelter people while out in the open but to not distance from nature, and thepresence of rain because while it is raining it is still very warm and ofcourse humid. There fore while it is important to shelter from rain it is also important to allow air to flow and cool such sheltered spaces.

 

The presence of water is celebrated by making its fall from roofs visible and audible as it reaches the earth and fills open pools which take overflow from large roof areas using gargoyles and water falls. Another aspect of the local tropical climate is the constant presence of a high level of humidity which makes use of natural ventilation as a way of minimising energy consumption difficult and the use of airconditioning of public spaces essential for comfort conditions to be achieved to acceptable comfort standards. Our main objective in this case is to minimise the cooling loads by reducing the incidence of sunlight on exposed glass facades. Thus glazing is always deeply set in to thefaçade on the north (in this case it is actually the true north façade which receives the midday sun due to the location of the site below the equator) and low sunlight from the east and west is minimised by vertical shading elements and perforated metal screens. The use of materials in the Congo Kintele Congress Center’s Resort Hotel were to alarge extent dictated by the requirement of speed of construction, and availability of modern construction and cladding materials, of which none exist in The Congo Republic. Thus although it would be more cost effective, concrete frame was ruled out in favour of steel and more easily transportable lighter cladding materials such as aluminium panelling for massive cladding elements such as block or brick work. Beyond that efforts were made to use natural materials at all times such as timber, and stone.

 

The larger elements are signified by a series of perforated cladding elements which are laser cut in geometric Congolese patterns derived from the traditions of thelarger region, connecting the buildings to their place. At times these patterns find themselves recalled in interior elements such as floor patterns and screens which divide interior spaces, and at times on external wall elements creating shading or privacy between inside and outside. Vertical shading elements are a lighter coloured bronz/brass finish, set against a background of larger darker coloured panels and of course glass. The overall colour palatte of the project is infact derived from a series of lighter and darker shades of bronz and brass.

 

Kintele Resort Hotel The 200 bedroom resort hotel also acts as an adjunct to the Congo Kintele Congress Center, providing both facilities for some of the presidential guests, with 6 presidential suites and their entourage, with a series of suites and standard rooms. On the ground floor are the spa, restaurant, bars and the pool all of which stand 5 metres above the level of the Congress Centre, providing panoramic views across the Congo Valley. Pedestrian links lead from the hotel pool side down to the major event courtyard below which also serves as an extension of the Public Piazza, which links again to the collonade running East West.

Products Behind Projects
Product Spotlight
News
Australia’s first solar-powered façade completed in Melbourne
12 Dec 2024 News
Australia’s first solar-powered façade completed in Melbourne

Located in Melbourne, 550 Spencer is the first building in Australia to generate its own electricity... More

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
11 Dec 2024 News
SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse

In the heart of Westminster, London, the London-based architectural studio SPPARC has restored and r... More

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
10 Dec 2024 News
Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals

Ryohei Tanaka of Japanese architectural firm G Architects Studio designed a bijou coffee stand in Ky... More

New building in Montreal by MU Architecture tells a tale of two facades
10 Dec 2024 News
New building in Montreal by MU Architecture tells a tale of two facades

In Montreal, Quebec, Le Petit Laurent is a newly constructed residential and commercial building tha... More

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 Dec 2024 News
RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin

Located on Georgetown University's downtown Capital Campus, the McCourt School of Policy by Robert A... More

MVRDV-designed clubhouse in shipping container supports refugees through the power of sport
9 Dec 2024 News
MVRDV-designed clubhouse in shipping container supports refugees through the power of sport

MVRDV has designed a modular and multi-functional sports club in a shipping container for Amsterdam-... More

Archello Awards 2025 expands with 'Unbuilt' awards categories
9 Dec 2024 Archello Awards
Archello Awards 2025 expands with 'Unbuilt' project awards categories

Archello is excited to introduce a new set of twelve 'Unbuilt' project awards for the Archello Award... More

Kinderspital Zürich by Herzog & de Meuron emphasizes role played by architecture in the healing process
6 Dec 2024 News
Kinderspital Zürich by Herzog & de Meuron emphasizes role played by architecture in the healing process

The newly completed Universtäts - Kinderspital Zürich (University Children’s Hospita... More