DTU Climate Challenge Laboratory B313

A laboratory for climate research and low-carbon innovation in Denmark

Applied products
View all applied products

Located at the heart of the Technical University of Denmark (DTU), the B313 Climate Challenge Laboratory is a pioneering research facility that embodies the university’s ambition to lead sustainable development through innovation, inclusivity, and architectural excellence. Designed to address the urgent global challenges of climate change, B313 integrates high-quality research environments with cutting-edge sustainability principles and vibrant community spaces.

photo_credit Niels Nygaard
Niels Nygaard
photo_credit Niels Nygaard
Niels Nygaard

The B313 Climate Challenge Laboratory is a special facility designed by Christensen & Co Architects. The building uses evidence-based strategies to reduce embodied carbon, ensure low-impact operations, and allow for future adaptability. Additionally, it serves as a civic and academic connector within DTU’s campus.

 

CLT structure and circular assembly

The seven-story laboratory building is one of Denmark’s tallest made with cross-laminated timber (CLT). The CLT panels from Stora Enso create the load-bearing structure, reducing carbon emissions by at least 30 percent compared to traditional new builds.

Applied Products block will be inserted here

 

Additional timber products like KVH Structural Timber, ThermoWood, and sawn planed wood are used internally. Using Sylva CLT allows for prefabrication and clean assembly, speeding up construction and minimizing waste. This material stores carbon and can be easily disassembled, reused, or recycled, supporting a circular economy.

photo_credit Niels Nygaard
Niels Nygaard
photo_credit Niels Nygaard
Niels Nygaard
Caption
photo_credit Niels Nygaard
Niels Nygaard

High-performance insulation, natural ventilation, and passive solar control minimize heating and cooling loads. The atrium serves as a thermal buffer, enhancing daylight access and cross-ventilation. The building relies entirely on non-fossil fuel heating, with flexible mechanical systems designed for low power draw, supported by daylighting and low-energy lighting to reduce operational energy use.

 

Landscape integration and green strategies

B313’s surroundings are planted with 160 native trees and shrubs, enhancing local biodiversity and supporting rainwater management. Marsh and forest ecologies are integrated into the site design, with permeable surfaces to slow runoff and improve water retention. Indoors, small trees are housed in glass cylinders, extending the landscape into the building’s social core.

photo_credit Niels Nygaard
Niels Nygaard
photo_credit Niels Nygaard
Niels Nygaard

Green facades and shading elements provide insect habitats and reduce solar gain, contributing to urban cooling. These interventions make the building resilient to future temperature increases and heavy rainfall, while improving the microclimate for occupants.

 

Inclusive Architecture and Universal Design

The project emphasizes inclusivity through user engagement, utilizing interviews, walkthroughs, and sensory mapping to address diverse cognitive, sensory, and physical needs. Architectural elements such as light gradients, acoustic zoning, and tactile materials embody universal design principles.

photo_credit Niels Nygaard
Niels Nygaard

The open ground floor serves a civic purpose, featuring climate-focused exhibitions, café areas, and art installations that encourage public interaction with environmental themes. This structure aligns with Denmark’s climate agenda and DTU’s research mission, showcasing the use of carbon-smart materials and circular design to balance institutional excellence with planetary responsibility.

 

Caption

Project credits

Landscape Architects
Contractors
Engineers

Sustainability

DGNB • Gold
2024
DGNB • Heart
2024
Low Carbon
Embodied carbon
Efficient
Operational Emissions / Energy
Efficient
Service and maintenance emissions
4
Key Low-Carbon Products

Project data

Project Year
2024
Category
Universities
Building Area
10700 m2
Share or Add DTU Climate Challenge Laboratory B313 to your Collections